Building Permits at 212 Van Buren St Nw Washington DC 20012


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 212 Van Buren St Nw Washington DC 20012 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
12, 2. 5" diameter soil borings will be advanced using direct push technology (e. G. Geoprobe), to a depth of approximately feet bgs (dependent upon groundwater depth). 3 soil borings will be converted to temporary groundwater monitoring points, and direct push grab water samples will be collected using a stainless steel check valve. Following sample collection and removal of the temporary screen, boreholes will be backfilled with bentonite chips, and fully hydrated until the chips come within 2-feet of the surface. The upper 6" of the boring will be completed with similar surface material.
Date:  December 8, 2014

Client: South Capital Street Partnership | Applicant: Tami Roberts Ehs Support | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500003
2014/12/08095212 Van Buren St Nw Washington Dc 20012
SCORE
56
12, 2. 5" diameter soil borings will be advanced using direct push technology (e. G. Geoprobe), to a depth of approximately feet bgs (dependent upon groundwater depth). 3 soil borings will be converted to temporary groundwater monitoring points, and direct push grab water samples will be collected using a stainless steel check valve. Following sample collection and removal of the temporary screen, boreholes will be backfilled with bentonite chips, and fully hydrated until the chips come within 2-feet of the surface. The upper 6" of the boring will be completed with similar surface material.
Date:  December 8, 2014

Client: South Capital Street Partnership | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500003
2014/12/08056212 Van Buren St Nw, Washington, Dc 20012Tami Roberts Ehs Support
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.