QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 212 Van Buren St Nw, Washington, Dc 20012 12, 2. 5" diameter soil borings will be advanced using direct push technology (e. G. Geoprobe), to a depth of approximately feet bgs (dependent upon groundwater depth). 3 soil borings will be converted to temporary groundwater monitoring points, and direct push grab water samples will be collected using a stainless steel check valve. Following sample collection and removal of the temporary screen, boreholes will be backfilled with bentonite chips, and fully hydrated until the chips come within 2-feet of the surface. The upper 6" of the boring will be completed with similar surface material. Date: December 8, 2014 Contractor: Tami Roberts Ehs SupportClient: South Capital Street Partnership | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1500003 |