Mechanical permit Date: February 1, 2016Permit status: Completed | Permit id: 638209 | |||||
Plumbing permit Date: January 29, 2016Permit status: Completed | Permit id: 637854 | |||||
Zoning admin review Date: September 3, 2014Permit status: Completed | Permit id: 547424 | |||||
Administrative permit Date: December 15, 2014Permit status: Completed | Permit id: 560501 | |||||
Plumbing permit Date: March 31, 2015Permit status: Completed | Permit id: 581802 | |||||
Electrical permit Date: December 2, 2014Permit status: Completed | Permit id: 562591 | |||||
Mechanical permit Date: December 22, 2014Permit status: Completed | Permit id: 575259 | |||||
Electrical permit Date: October 15, 2015Permit status: Completed | Permit id: 637266 | |||||
Zoning/use permit Date: July 1, 2014Permit status: Completed | Permit id: 545570 | |||||
Zoning permit Date: June 16, 2014Permit status: Completed | Permit id: 470354 | |||||
Alteration permit Date: October 23, 2015Permit status: Completed | Permit id: 632125 | |||||
Suppression permit Date: November 2, 2015Permit status: Completed | Permit id: 649364 | |||||
New construction permit Date: July 25, 2014Permit status: Completed | Permit id: 545994 | |||||
Suppression permit Date: December 19, 2014Permit status: Completed | Permit id: 559568 | |||||
Mechanical permit Date: September 18, 2015Permit status: Completed | Permit id: 637122 | |||||
Use permit Date: July 13, 2015Permit status: Completed | Permit id: 613257 | |||||
Administrative permit Date: July 9, 2015Permit status: Completed | Permit id: 623380 | |||||
Permit for the relocation of lot line to create one(1) lot from five(5) deeded lots and from one(1) brt account ( 1720- fairmount. For the erection of a four (4) story an attached structure (48 high) with cellar, balconies at 3rd and 04th floor, deck on 2nd floor, roof deck with accessory pilot house, for the creation to ten (10) accessory off-street parking spaces including with one (1) h/c space for use as twenty-one (21) dwelling units from 2nd st floor thru 04th floor and commercial space from cellar thru first floor. Size and location as shown in the application. Date: July 15, 2013Applicant: David G. Orphanides, Esq. | Permit type: Appeal | Permit status: Withdrawn | Completion date: October 4, 2013 | Permit id: 20855 | |||||
Permit for a brewery (limited industrial) and sit down restaurant with accessory parking spaces on 1st floor with existing eighteen (18) multi-family dwelling above as previously approved. Date: July 2, 2015Applicant: Steven Masters Esq | Permit type: Appeal | Permit status: Withdrawn | Permit id: 25549 | |||||
Plumbing permit Date: March 31, 2015Permit status: Completed | Permit id: 581802 | |||||
Plumbing permit Date: January 29, 2016Permit status: Completed | Permit id: 637854 | |||||
Electrical permit Date: December 2, 2014Permit status: Completed | Permit id: 562591 | |||||
Zoning permit Date: June 16, 2014Permit status: Completed | Permit id: 470354 | |||||
Mechanical permit Date: September 18, 2015Permit status: Completed | Permit id: 637122 | |||||
New construction permit Date: July 25, 2014Permit status: Completed | Permit id: 545994 | |||||
Zoning use permit Date: July 1, 2014Permit status: Completed | Permit id: 545570 | |||||
Use permit Date: July 13, 2015Permit status: Completed | Permit id: 613257 | |||||
Suppression permit Date: December 19, 2014Permit status: Completed | Permit id: 559568 | |||||
Mechanical permit Date: December 22, 2014Permit status: Completed | Permit id: 575259 | |||||
Alteration permit Date: October 23, 2015Permit status: Completed | Permit id: 632125 | |||||
Administrative permit Date: July 9, 2015Permit status: Completed | Permit id: 623380 | |||||
Administrative permit Date: December 15, 2014Permit status: Completed | Permit id: 560501 | |||||
Suppression permit Date: November 2, 2015Permit status: Completed | Permit id: 649364 | |||||
Zoning admin review Date: September 3, 2014Permit status: Completed | Permit id: 547424 | |||||
Mechanical permit Date: February 1, 2016Permit status: Completed | Permit id: 638209 | |||||
Electrical permit Date: October 15, 2015Permit status: Completed | Permit id: 637266 | |||||
Permit for the relocation of lot line to create one(1) lot from five(5) deeded lots and from one(1) brt account ( 1720- fairmount. For the erection of a four (4) story an attached structure (48 high) with cellar, balconies at 3rd and 04th floor, deck on 2nd floor, roof deck with accessory pilot house, for the creation to ten (10) accessory off-street parking spaces including with one (1) h c space for use as twenty-one (21) dwelling units from 2nd st floor thru 04th floor and commercial space from cellar thru first floor. Size and location as shown in the application. Date: July 15, 2013Applicant: David G. Orphanides, Esq. | Permit type: Appeal | Permit status: Withdrawn | Completion date: October 4, 2013 | Permit id: 20855 | |||||
Permit for a brewery (limited industrial) and sit down restaurant with accessory parking spaces on 1st floor with existing eighteen (18) multi-family dwelling above as previously approved. Date: July 2, 2015Applicant: Steven Masters Esq | Permit type: Appeal | Permit status: Withdrawn | Permit id: 25549 | |||||
SCORE 86 Install one 6 gallon wet chem system ez standard kitchen fire suppression- for the installation of new wet chemical kitchen hood fire suppression system as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: October 7, 2015 Contractor: J And S Fire Protection IncPermit type: Suppression permit | Permit status: Completed | Completion date: March 2, 2016 | Permit id: 643427 | |||||
SCORE 100 Install 24 wc,18 ks,18 washer box,21 tubs,3 showers, lavs,3 fd,1ad,1 ms and 8 rd (mixed use)the installation will comply with the philadelphia plumbing code 2004 Date: March 31, 2015 Contractor: Tandem Associates IncPermit type: Plumbing permit | Permit status: Completed | Completion date: August 14, 2015 | Permit id: 581802 | |||||
SCORE 100 Install 200amp meter & panel for temporary power & lighting & hook up power to trailer (bldg site) from 8 25 14 to 11 25 14 as per nec 2008 Date: August 13, 2014 Contractor: Rue Electric IncPermit type: Electrical permit | Permit status: Completed | Completion date: June 9, 2015 | Permit id: 555486 | |||||
Tco for 2nd, 3rd and 4th floors only. Date: July 9, 2015Permit type: Administrative permit | Permit status: Completed | Completion date: July 16, 2015 | Permit id: 623380 | |||||
SCORE 86 Install one, type 1 commercial kitchen hood in two sections and wrapped (2-hour fire resistance rated) exhaust duct connected to existing grease duct supplied by owner... Date: September 18, 2015 Contractor: J And S Fire Protection IncPermit type: Mechanical permit | Permit status: Completed | Completion date: March 2, 2016 | Permit id: 637122 | |||||
SCORE 100 Interior alterations to include tenant fit-out, non load bearing partitions, ada compliant restrooms, ada seating throughout 1st floor space, two (2) exits to be maintained in the basement and 1st floor level, upgrades to finishes, and combustible material shall be of fire retardant treated wood as per section 603 of th 2009 ibc, and all other work as per approved plans. Separate permit required for any mechanical, electrical, plumbing, and fire suppression work. Ensure type ia construction is maintained & approved exit signs are provided per 1011 of the 2009 ibc in the basement. Date: October 23, 2015 Contractor: Horstmann Lynch Cons Svcs LlcPermit type: Alteration permit | Permit status: Completed | Completion date: February 17, 2016 | Permit id: 632125 | |||||
SCORE 100 Electrical construction for a bar restaurant fit-out on the 1st floor - the installation will comply with the approved plans and the 2008 nec Date: October 15, 2015 Contractor: Caniglia And Co IncPermit type: Electrical permit | Permit status: Completed | Completion date: February 17, 2016 | Permit id: 637266 | |||||
Change vacant commercial space to a sit down restaurant with accessory brewery for ninety(90) persons (45 sft) on first floor (no signs) Date: July 13, 2015Permit type: Use permit | Permit status: Completed | Completion date: July 13, 2015 | Permit id: 613257 | |||||
For the consolidation of (5) lot into (1) for the erection of a four story structure to be used as (21) residential units and one vacant commercial space. Ten accessory parking stalls one ada van accessible. Date: June 16, 2014Permit type: Zoning permit | Permit status: Completed | Completion date: June 16, 2014 | Permit id: 470354 | |||||
SCORE 100 Installation of fire suppression system with a 4" fire service line in accordance with nfpa 13 and nfpa 13r for the residential occupancy and for the installation of two (2) standpipe risers as per plans. Date: December 19, 2014 Contractor: Legacy Fire Sprinkler ServicesPermit type: Suppression permit | Permit status: Completed | Completion date: August 14, 2015 | Permit id: 559568 | |||||
For the erection of a foundation only for a proposed mixed use building as per approved plans. Separate permits required for construction of remainder of building and certificate of occupancy. Date: July 25, 2014Permit type: New construction permit | Permit status: Completed | Completion date: April 8, 2015 | Permit id: 545994 | |||||
For the administrative review to change the angle of parking along melon street to 45 degree , reduce 2 curb cut of 24 feet wide each, and carriage style garage doors instead of featuring . No garage doors. Date: September 3, 2014Permit type: Zoning admin review | Permit status: Completed | Completion date: September 3, 2014 | Permit id: 547424 | |||||
SCORE 100 Install all power & lighting, tele & catv & fire alarm & wire as per nec 2008 as per nec 2008 & nfpa 72 (mixed use) Date: December 2, 2014 Contractor: Rue Electric IncPermit type: Electrical permit | Permit status: Completed | Completion date: August 22, 2015 | Permit id: 562591 | |||||
SCORE 89 For the installation of eighteen (18) roof top units, eight (8) heat pump systems, one-hundred twenty (120) registers and diffusers and associated ductwork, piping and thermostats. All work per approved plans. Separate permit required for electrical, plumbing, fire suppression. Date: December 22, 2014 Contractor: All Shore IncPermit type: Mechanical permit | Permit status: Completed | Completion date: August 10, 2015 | Permit id: 575259 | |||||
SCORE 100 Tenant fit-out on the 1st floor & basement for a bar restaurant (hygge brew pub) - the installation will compy with the phila plumbing code 2004 including tables p-811. 2 and p-904. 7 and table 608. 1 of the 2009 ipc (international plumbing code) Date: January 29, 2016 Contractor: Best Choice Plumbing IncPermit type: Plumbing permit | Permit status: Completed | Completion date: March 2, 2016 | Permit id: 637854 | |||||
SCORE 89 Provide heating and cooling system ductwork for 2-gas fired units and 1-heat pump system including all necessary registers, grills, control wiring, refrigerant piping, condensate drain, and flue piping. Also venting for bath fans and fresh air to systems. Commercial kitchen exhaust hood installation secured under separate permit. Date: February 1, 2016 Contractor: All Shore IncPermit type: Mechanical permit | Permit status: Completed | Completion date: March 2, 2016 | Permit id: 638209 | |||||
SCORE 100 Ez permit sprinkler relocation (nfpa 13)- for the relocation of sprinkler heads as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: November 2, 2015 Contractor: Legacy Fire Sprinkler ServicesPermit type: Suppression permit | Permit status: Completed | Completion date: March 2, 2016 | Permit id: 649364 | |||||
SCORE 99 Installation of an exhaust duct within a 2 hour shaft as per plan. Separate use registration permit, c. O., m, e, p and fss permits required. Date: May 11, 2015 Contractor: Janet MonitzerPermit type: Mechanical permit | Permit status: Completed | Completion date: July 20, 2015 | Permit id: 605093 | |||||
New construction of an attached four (4) story structure with a cellar and common roof deck for use as a vacant commercial space on the first floor and eighteen (18) family dwelling on the second through fourth floors. First floor type ia construction, second through fourth floors type vb construction. See a p # 545994 for foundation work use registration and c. O. Permits required prior to occupancy of first floor commercial space separate m,e,p and fire suppression permits required Date: November 4, 2014Permit type: New construction permit | Permit status: Completed | Completion date: August 11, 2015 | Permit id: 561557 | |||||
For the erection of an attached structure (48 high) with cellar; for the erection of awning ( above the commercial entry ) , deck at 2nd floor level at rear; balcony at 3rd and 4th floors; enclosed stair tower (access to roof only); for the creation of nine(9) accessory parking spaces including with one (1) h c space on first floor . Size and location as shown in the application. For a multi-family household living (eighteen( 18) dwelling units) from 2nd floor thru 04th floor and one (1) vacant commercial space from cellar thru first floor ( use registration permit required prior to occupancy). Date: July 1, 2014Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 5, 2014 | Permit id: 545570 | |||||
Amend permit number 545994 to increase slab thicknes due to higher water table as per approved plans and details. Separate permits required for construction of remainder of building and certificate of occupancy. Date: December 15, 2014Permit type: Administrative permit | Permit status: Completed | Completion date: February 20, 2015 | Permit id: 560501 |