QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 354 Brevard Rd, Asheville, Nc 28806 January 12, 2006 11:02:36 am ccox replacing deck to back of house.; exterior wood deck construction. Building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the job site at all times during the project. The permit shall be in a weathertight location or container accessible to the city inspectors during their inspections. Note!!! - the inspector will turn down an inspection if the permit, approved plans, and plan review comments are not on the jobsite. Footing inspection required: footing inspection is to be made by the building inspector after the trenches are excavated, all grade stakes are installed, all required reinforcing steel and supports are in pl Client: Goldie Deck | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 06-00163 | Parcel: 15665 |