Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Goldie replace deck Date: January 19, 2006 Permit status: Closed | Permit id: 06-00163 | |||||
Kutyana dirt pile Value: $1,000 Client: Kutyana Dirt Pile | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 10-00128 | Parcel: 15665 | |||||
January 5, 20 11:11:53 am cbeavers. Placing dirt on property location: i-2 to brevard rd, then turn r off ramp, 3rd on right; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading/erosion and stormwater inspector assigned to this project is toby shelton who can be reached at redacted phone number. Grading waiver site must stay in compliance with all federal, state and local regulations. If site falls out of compliance for any of the agencies stated above, the project stands the chance of having a notice of violation issued against the project to shutting down the job and retracting the approval for the land disturbance. Please stay in compliance. If any of the minimum best management practices fail to adequately keep sedimentation on the site, it shall be the responsibility of the owner to correct. Please note that temporary ground cover must be established, prior to grading being released for the issuance of a temporary certificate Permit type: Planning - historical | Permit status: Closed | Permit id: 10-00128 | Parcel: 15665 | |||||
Kutyana dirt pile Date: July 1, 2010 Value: $1,000 Client: Kutyana Dirt Pile | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 10-00128 | Parcel: 15665 | |||||
Goldie / replace deck Date: January 19, 2006 Value: $1,200 Permit type: Residential | Permit status: Closed | Permit id: 06-00163 | |||||
SCORE 100 December 29, 2009 10:03: am ajohnson. Install 1(1/2) ton heat pump to replace gas furnace. Rec. Via fax. Please call (828)redacted phone number for inspection. Aej Date: January 3, 2010 Contractor: Clydes Heating And Cooling Client: Kutona, Mike | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-06439 | Parcel: 352878 | |||||
SCORE 100 December 22, 2009 3:27:07 pm ajohnson. Service upgrade, new hvac hook-up. Rec. Walk-in. Please call (828) redacted phone number. Aej Date: January 3, 2010 Contractor: Ebp Electric Client: Kutyana, Michael | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-06407 | Parcel: 352878 | |||||
Goldie replace deck Date: January 19, 2006 Value: $1,200 Permit type: Residential | Permit status: Closed | Permit id: 06-00163 | |||||
January 5, 20 11:11:53 am cbeavers. Placing dirt on property location: i-2 to brevard rd, then turn r off ramp, 3rd on right; engineering inspections requests must be made at least 24 hours in advance of inspections. The grading erosion and stormwater inspector assigned to this project is toby shelton who can be reached at redacted phone number. Grading waiver site must stay in compliance with all federal, state and local regulations. If site falls out of compliance for any of the agencies stated above, the project stands the chance of having a notice of violation issued against the project to shutting down the job and retracting the approval for the land disturbance. Please stay in compliance. If any of the minimum best management practices fail to adequately keep sedimentation on the site, it shall be the responsibility of the owner to correct. Please note that temporary ground cover must be established, prior to grading being released for the issuance of a temporary certificate Date: July 1, 2010 Permit type: Planning - historical | Permit status: Closed | Permit id: 10-00128 | Parcel: 15665 | |||||
SCORE 56 January 12, 2006 11:02:36 am ccox replacing deck to back of house.; exterior wood deck construction. Building comments: refer to the plan review comments attached to the approved drawings for important information or corrections for compliance with the building code. The approved plans and review comments are required to be kept on the jobsite for viewing by the city inspectors. The building permit is required to be posted on the job site at all times during the project. The permit shall be in a weathertight location or container accessible to the city inspectors during their inspections. Note!!! - the inspector will turn down an inspection if the permit, approved plans, and plan review comments are not on the jobsite. Footing inspection required: footing inspection is to be made by the building inspector after the trenches are excavated, all grade stakes are installed, all required reinforcing steel and supports are in pl Client: Goldie Deck | Permit type: Res: accessory structure | Permit status: Closed | Current use: Residential | Permit id: 06-00163 | Parcel: 15665 |