Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 222 High St, Palo Alto, Ca 94301 Ti for existing tenant "peninsula open space trust". Scope of work includes remodel of existing breakroom. Replace millwork and interior finishes, new sink and minor electrical work. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-00110 | |||||
SCORE 93 Date: October 22, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00627 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 15-468: revised location for sand oil and grease intercepter. Install pump at low side and revised associated structural and plumbing. Date: October 14, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00594 | |||||
SCORE 93 Date: October 9, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00582 | |||||
SCORE 93 Date: August 25, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00486 | |||||
SCORE 93 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02204 | |||||
SCORE 93 Date: July 30, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00444 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 13-3384: window addition at middlefield face ; revision of opening window to door @ inner facade facing parking lot. Date: March 6, 2015 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00137 | |||||
SCORE 93 Date: March 6, 2015 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00559 | |||||
SCORE 93 Date: February 24, 2015 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-00469 | |||||
SCORE 93 245 Lytton Av, Palo Alto, Ca 94301 Sand hill global advisors: 2,945 sf on 3rd floor ti for (e) tenant. Includes (n) interior partitions, doors, glazing, lighting, hvac, and sprinklers. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03031 | |||||
SCORE 93 Date: November 24, 2014 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03018 | |||||
SCORE 93 Date: November 14, 2014 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00694 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 13000-03384: replace (e) tree #2 lophostemon confertus with (2) 48" box acer palmatum "bloodgood" Date: November 4, 2014 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00666 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 T. I. And u&o for "lab corp, inc." (902 sf): upgrade (e) toilet room, modify (e) electrical, lighting and power, no new rooftop equipment or exterior changes, no new change to service Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02154 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 13000-03384: addition of interior columns to support roof light wells for clerestory windows and revised ceiling framing, adding (1) roof lightwell at building b and reduced size of adjacent lightwell, adding (n) clerestory windows Date: July 10, 2014 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00403 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 Landlord work only - commercial remodel: partial demo of (e) 1-story structure and extensive interior remodel including removal of portions of exterior walls, windows, finishes, roofing and portions of (e) interiors, replace (e) skylight, repave and restripe parking lot with new landscaping; replace (e) mechanical units and install (n) fire sprinkler system. Additional address application received 12. 17. 15 jc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03384 | |||||
SCORE 93 Date: November 15, 2013 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03052 | |||||
SCORE 93 2875 El Camino Real, Palo Alto, Ca 94306 Permit voided at request of property owner sherwin williams: ti and u&o for a 3198 sf tenant space on the first floor. Permit type: Project - building permit | Permit status: Void | Permit id: 13000-01777 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01929 | |||||
SCORE 93 Date: June 18, 2013 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00388 | |||||
SCORE 93 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01506 | |||||
SCORE 93 Date: February 24, 2015 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00470 | |||||
SCORE 93 Date: April 6, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00226 | |||||
SCORE 93 2875 El Camino Real, Palo Alto, Ca 94306 Opes advisors: ti and u&o for a 3198 sf tenant space on the first floor. Scope of work includes new hvac equipment on the roof u&o sent 12/1/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00781 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 13000-03384: revision to the structural calculations upgrade to strengthening of remaining portion of building, including the following: roof leveling & strengthening, roof diaphragam strenghtening, lfrs strengthening Date: March 18, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00188 | |||||
SCORE 93 Date: November 4, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00705 | |||||
SCORE 93 Date: March 10, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00165 | |||||
SCORE 93 Date: December 17, 2014 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03193 | |||||
SCORE 93 2555 Park Bl, Palo Alto, Ca 94306 New warm shell for three story commercial 23,853 sf building, and below grade parking structure. (13pln-00381). 12 21 15 roof deck was removed from scope of work. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-03192 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 15000-00468: revised landscape planting, addition of silva cells beneath sidewalk. Date: November 7, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00710 | |||||
SCORE 93 5 Lytton Av, Palo Alto, Ca 94301 U&o and 1000sf office tenant improvement for "csc venture capital" venture capital to occupy 17 sf suite 304. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-03157 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 15000-00468: revision to change the restroom on first, second and third floors, entrance clearance, modify door swing one of the stalls Date: July 21, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00469 | |||||
SCORE 93 Date: January 19, 2017 Contractor: S B C C Inc Permit type: Project - building permit | Permit status: Permit issued | Permit id: 17000-00123 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 15000-00468: deferred submittal for additional metail stair details Date: March 9, 2016 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00160 | |||||
SCORE 93 3 Hamilton Av, Palo Alto, Ca 94301 Ti and u&o for new tenant "charles river ventures" third floor interior only (2) new conference rooms and new lobby area. Area of work 9 sf . Associated mechanical and electrical. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-03168 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 New mixed use office ~50,000sf and residential ~4,800s. 2 levels below grade parking ~100,000sf. (partial demo structure issued under 15-469)) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00468 | |||||
SCORE 93 Date: March 9, 2016 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00159 | |||||
SCORE 93 Date: March 9, 2016 Contractor: S B C C Inc Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 16rev-00158 | |||||
SCORE 93 251 University Av, Palo Alto, Ca 94301 Fidelity investments: ti and u&o for expansion of tenant onto the second floor (6,2 sf). U&o sent 3 1 16 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-00887 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 13000-03384: revised plans include deletion of tree and exchanging ac pavement for gravel on 738 homer. Date: October 4, 2016 Contractor: S B C C Inc Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00633 | |||||
SCORE 93 26 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Demo commercial building 6 floors above grade and 1 below grade parking 62,616 sf in preparation for new commercial structure. Below grade parking garage walls to remain. Date: March 7, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17000-00476 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca 13-3384: window addition at middlefield face ; revision of opening window to door @ inner facade facing parking lot. Date: March 6, 2015 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 15rev-00137 | |||||
SCORE 93 Date: March 6, 2015 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 15000-00559 | |||||
SCORE 93 385 Sherman Av, Palo Alto, Ca 94306 San Diego Ca New mixed use office ~50,000sf and residential ~4,800s. 2 levels below grade parking ~100,000sf. Permit status: Lr - approved | Permit id: 15000-00468 | |||||
SCORE 93 Date: February 24, 2015 Contractor: S B C C Inc Permit status: In plan check | Permit id: 15000-00469 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca Landlord work only - commercial remodel: partial demo of (e) 1-story structure and extensive interior remodel including removal of portions of exterior walls, windows, finishes, roofing and portions of (e) interiors, replace (e) skylight, repave and restripe parking lot with new landscaping; replace (e) mechanical units and install (n) fire sprinkler system. Additional address application received 12. 17. 15 jc Permit status: Permit issued | Permit id: 13000-03384 | |||||
SCORE 93 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Sand hill global advisors: 2,945 sf on 3rd floor ti for (e) tenant. Includes (n) interior partitions, doors, glazing, lighting, hvac, and sprinklers. Permit status: Permit issued | Permit id: 14000-03031 | |||||
SCORE 93 Date: November 24, 2014 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 14000-03018 | |||||
SCORE 93 Date: November 14, 2014 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 14rev-00694 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca 13000-03384: replace (e) tree #2 lophostemon confertus with (2) 48" box acer palmatum "bloodgood" Date: November 4, 2014 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 14rev-00666 | |||||
SCORE 93 636 Waverley St, Palo Alto, Ca 94301 San Diego Ca 13000-02823: deferred submittal for commercial storefront glazing. No change to exterior Date: February 27, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17rev-00116 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca 13000-03384: addition of interior columns to support roof light wells for clerestory windows and revised ceiling framing, adding (1) roof lightwell at building b and reduced size of adjacent lightwell, adding (n) clerestory windows Date: July 10, 2014 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 14rev-00403 | |||||
SCORE 93 2875 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Permit voided at request of property owner sherwin williams: ti and u&o for a 3198 sf tenant space on the first floor. Permit status: Void | Permit id: 13000-01777 | |||||
SCORE 93 Date: November 15, 2013 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 13000-03052 | |||||
SCORE 93 Permit status: Permit issued | Permit id: 13000-01929 | |||||
SCORE 93 Date: June 18, 2013 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 13rev-00388 | |||||
SCORE 93 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Acessibility upgrades to 3rd floor bathroom core (4 sf) Permit status: Permit issued | Permit id: 13000-01506 | |||||
SCORE 93 251 University Av, Palo Alto, Ca 94301 San Diego Ca Fidelity investments: ti and u&o for expansion of tenant onto the second floor (6,2 sf). U&o sent 3 1 16 Date: April 9, 2015 Contractor: S B C C Inc Permit status: Finaled | Permit id: 15000-00887 | |||||
SCORE 93 Date: February 24, 2015 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 15000-00470 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00642 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00641 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00640 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00639 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00638 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00636 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00635 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00634 | |||||
SCORE 93 Date: March 18, 2016 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 16000-00633 | |||||
SCORE 93 Date: March 28, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17000-00658 | |||||
SCORE 93 425 Page Mill Rd, Palo Alto, Ca 94306 San Diego Ca Construction of a new three story mixed use building with one level of underground parking (71,075 sf). Scope of work includes 16 apartments on the second and third floors, office on the second floor, and retail on the first floor. Residential units to have separate electrical meters and shared gas meters Permit status: Permit issued | Permit id: 16000-00632 | |||||
SCORE 93 5 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Owner improvement: interior improvement to public areas within the building (2923 sf) Permit status: Permit issued | Permit id: 16000-03026 | |||||
SCORE 93 5 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Exterior site repair. Remove damaged stucco areas and repair to new. Repaint to planning approved color scheme (16pln-00397) Permit status: Permit issued | Permit id: 17000-00779 | |||||
SCORE 93 26 El Camino Real, Palo Alto, Ca 94306 San Diego Ca 17000-00476: revision to change bracing details at the basement Date: October 12, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17rev-00659 | |||||
SCORE 93 636 Waverley St, Palo Alto, Ca 94301 San Diego Ca 13000-02823: deferred submittal for residential glazing. No change to exterior Date: February 27, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17rev-00115 | |||||
SCORE 93 Date: June 22, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17000-01404 | |||||
SCORE 93 5 Lytton Av, Palo Alto, Ca 94301 San Diego Ca U&o and 1000sf office tenant improvement for "csc venture capital" venture capital to occupy 17 sf suite 304. Permit status: Finaled | Permit id: 16000-03157 | |||||
SCORE 93 853 Middlefield Rd, Palo Alto, Ca 94301 San Diego Ca T. I. And u&o for "lab corp, inc." (902 sf): upgrade (e) toilet room, modify (e) electrical, lighting and power, no new rooftop equipment or exterior changes, no new change to service. U&o sent 12 16 16 Date: August 20, 2014 Contractor: S B C C Inc Permit status: Finaled | Permit id: 14000-02154 | |||||
SCORE 93 2875 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Opes advisors: ti and u&o for a 3198 sf tenant space on the first floor. Scope of work includes new hvac equipment on the roof u&o sent 12 1 14 Date: April 4, 2014 Contractor: S B C C Inc Permit status: Finaled | Permit id: 14000-00781 | |||||
SCORE 93 2555 Park Bl, Palo Alto, Ca 94306 San Diego Ca 14000-03192: revision includes udpated dimensions of parking machine pits. Relocation of accessible parking spots from basement to 1st floor parking. Area drains and ramp curb on basement level udpated. Below grade details revised. Eliminating windows at 1st floor parking. Permit status: In plan check | Permit id: 17rev-00315 | |||||
SCORE 93 26 El Camino Real, Palo Alto, Ca 94306 San Diego Ca Warm shell for a new four story office building over one level of basement garage parking (36,957 sf). Office is structurally connected to a two story above grade parking garage (24,059 sf). Building does not have a gas meter. Permit status: Permit issued | Permit id: 17000-00928 | |||||
SCORE 93 425 Page Mill Rd, Palo Alto, Ca 94306 San Diego Ca 16000-00632: deferred submittal shop drawings for core brace framing Date: June 14, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17rev-00345 | |||||
SCORE 93 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Sand hill global advisors: commercial ti (n) wall to create seperated space (n) electrical for udpated lighting and av equipment (n) mechanical to update hvac system. Sprinkler and various finish work. Permit status: Permit issued | Permit id: 17000-01572 | |||||
SCORE 93 5 Lytton Av, Palo Alto, Ca 94301 San Diego Ca Landlord improvements that includes landscaping, site lighting, patio areas, planters at (e) building, deck and fountain Permit status: Approved | Permit id: 17000-01720 | |||||
SCORE 93 425 Page Mill Rd, Palo Alto, Ca 94306 San Diego Ca Temp power - temp post. Relocate temp power pole by 4-feet previously installed under 17000-00658 Date: August 11, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17000-01918 | |||||
SCORE 93 3 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Ti and u&o for new tenant "charles river ventures" third floor interior only (2) new conference rooms and new lobby area. Area of work 9 sf . Associated mechanical and electrical. Permit status: Finaled | Permit id: 16000-03168 |