Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Demo commercial building 6 floors above grade and 1 below grade parking 62,616 sf in preparation for new commercial structure. Below grade parking garage walls to remain. Date: March 7, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17000-00476 | |||||
SCORE 100 Install additional outlet in mens restroom on 2nd and 5th floor. Date: October 23, 2012 Contractor: Foley Electric Inc Permit status: Permit issued | Permit id: 12000-02654 | |||||
On site utility relocation (water, electric, sewer, storm, and fire). All work being done on the utlity side of the meters. New building will not have a gas meter. Date: March 21, 2017 Value: $24,500 Permit status: In plan check | Permit id: 17000-00599 | |||||
SCORE 93 17000-00476: revision to change bracing details at the basement Date: October 12, 2017 Contractor: S B C C Inc Permit status: Permit issued | Permit id: 17rev-00659 | |||||
SCORE 93 Warm shell for a new four story office building over one level of basement garage parking (36,957 sf). Office is structurally connected to a two story above grade parking garage (24,059 sf). Building does not have a gas meter. Permit status: Permit issued | Permit id: 17000-00928 | |||||
SCORE 95 Temporary 4 amp service Date: August 10, 2017 Contractor: Wong Electric Inc Permit status: In plan check | Permit id: 17000-01904 | |||||
17000-00476: revision replacing two structural sheets for shoring Date: January 4, 2018 Permit status: In plan check | Permit id: 18rev-00003 |