Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 86 Date: June 29, 2015 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-198 | |||||
SCORE 86 Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: July 9, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-218 | |||||
SCORE 86 Pv1 sfd. Total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Pv1 sfd. Total system size 6kw ac using central inverter system. Using Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Pv1 sfd total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Pv1. Install roof mounted pv system sized 4. 7 kw. Interconnected with Date: July 14, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-222 | |||||
SCORE 86 Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 Plan check for a pv1 roof-mounted pv system. System size is 3. 2 kwac a Date: July 23, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-235 | |||||
SCORE 86 Pv2 (apartment unit). Install roof mounted pv system sized 2. 2 kw. Int Date: September 18, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: Apartment | Permit id: 15041-20000-263 | |||||
SCORE 86 Electrical Date: September 25, 2015 Contractor: Gerardo Salazar Permit status: Issued | Current use: Apartment | Permit id: 15041-20001-263 | |||||
SCORE 86 Plan check for a pv1 roof-mounted pv system. System size is 3 kwac and Date: October 27, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-359 | |||||
SCORE 86 Pv1, roof mounted solar panel, 6. 8kw (1) inverter: se6000a-us power op Date: November 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-378 | |||||
SCORE 86 Pv1. New solar system on existing residential roof-top. Total system s Date: November 24, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-396 | |||||
SCORE 86 Pv1, rooftop mounted solar system 3kw ac. Interconnected to (upgraded) Date: December 4, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 Pv1, roof mounted solar 3. 8kw ac interconnected (upgrade) to 200a serv Date: December 4, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 Pv1 roof mounted solar installation. 3. 8kw ac system (17) sw275 mono b Date: December 7, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-410 | |||||
SCORE 86 Electrical Date: January 4, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 Pv1. Roofmounted solar system. System size: 6 kw ungrounded. Using 300 Date: January 4, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 Plan check for a pv1 roof-mounted pv system. System size is 3. 8 kwac a Date: January 4, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: January 7, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-005 | |||||
SCORE 86 Pv1. Installation of rooftop mounted, utility-interactive 4 kw pv s Date: January 12, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-010 | |||||
SCORE 86 Plan check for pv roof mounted system. System size: 3. 8kw with 13 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: January 20, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-021 | |||||
SCORE 86 138 Valerio St Los Angeles Ca 91405 Plan check for a pv1 roof-mounted pv system. System size is 3. 8 kwac a Date: February 26, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-068 | |||||
SCORE 86 4513 Lennox Ave Los Angeles Ca 91423 Pv1 sfd. Total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-038 | |||||
SCORE 86 142 82nd Pl Los Angeles Ca 90003 Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: January 20, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-021 | |||||
SCORE 86 4519 Lennox Ave Los Angeles Ca 91423 Pv1 sfd total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Date: December 9, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-415 | |||||
SCORE 86 Date: January 20, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-021 | |||||
SCORE 86 152 Roxford St Los Angeles Ca 91342 Pv2 (apartment unit). Install roof mounted pv system sized 2. 2 kw. Int Date: September 18, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: Apartment | Permit id: 15041-20000-263 | |||||
SCORE 86 Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-038 | |||||
SCORE 86 521 Curson Ave Los Angeles Ca 90036 Pv1, rooftop mounted solar system 3kw ac. Interconnected to (upgraded) Date: December 4, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 13226 Kismet Ave Los Angeles Ca 91342 Pv1. New solar system on existing residential roof-top. Total system s Date: November 24, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-396 | |||||
SCORE 86 Date: January 15, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 11225 Allegheny St Los Angeles Ca 91352 Plan check for a pv1 roof-mounted pv system. System size is 7. 6 kwac a Date: March 7, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-076 | |||||
SCORE 86 23 Spaulding Ave Los Angeles Ca 90016 Add sill plate anchor bolts and cripple wall plywood per la city stand Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15016-20000-185 | |||||
SCORE 86 19532 Gifford St Los Angeles Ca 91335 Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 6533 Bellingham Ave Los Angeles Ca 91606 Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 9627 Dorrington Ave Los Angeles Ca 91331 Plan check for a pv1 roof-mounted pv system. System size is 3. 8 kwac a Date: January 4, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 1156 1st St Los Angeles Ca 90731 Pv1. New solar system on existing residential roof-top. Total system s Date: February 11, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-10000-049 | |||||
SCORE 86 5232 Elvira Road Los Angeles Ca 91364 Pv1. Roofmounted solar system. System size: 6 kw ungrounded. Using 300 Date: January 4, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 1252 Yosemite Dr Los Angeles Ca 90041 Plan check for a pv1 roof-mounted pv system. System size is 3. 9 kwac a Date: February 3, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 Date: February 29, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-440 | |||||
SCORE 86 13441 Vose St Los Angeles Ca 91405 Pv1, roof mounted solar panel, 6. 8kw (1) inverter: se6000a-us power op Date: November 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-378 | |||||
SCORE 86 10857 Blucher Ave Los Angeles Ca 91344 Pv1, roof mounted solar 3. 8kw ac interconnected (upgrade) to 200a serv Date: December 4, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 Date: September 25, 2015 Contractor: Gerardo Salazar Permit status: Issued | Current use: Apartment | Permit id: 15041-20001-263 | |||||
SCORE 86 4352 Camero Ave Los Angeles Ca 90027 Pv1. New solar system on existing residential roof-top. Total system s Date: November 25, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-399 | |||||
SCORE 86 6515 Murietta Ave Los Angeles Ca 91401 Pv1 roof mounted solar installation. 3. 8kw ac system (17) sw275 mono b Date: December 7, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-410 | |||||
SCORE 86 11244 Erwin St Los Angeles Ca 91606 Plan check for a pv1 roof-mounted pv system. System size is 3 kwac and Date: October 27, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-359 | |||||
SCORE 86 8813 Murietta Ave Los Angeles Ca 91402 Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: January 11, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-008 | |||||
SCORE 86 1135 84th St Los Angeles Ca 90044 Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: February 26, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-068 | |||||
SCORE 86 Date: March 7, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-079 | |||||
SCORE 86 Date: October 30, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-235 | |||||
SCORE 86 6924 Balcom Ave Los Angeles Ca 91335 Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: July 9, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-218 | |||||
SCORE 86 8517 Kester Ave Los Angeles Ca 91402 Pv1. Install roof mounted pv system sized 4. 7 kw. Interconnected with Date: July 14, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-222 | |||||
SCORE 86 4302 Bellingham Ave Los Angeles Ca 91604 Pv1 sfd. Total system size 6kw ac using central inverter system. Using Date: July 10, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 2326 Meadowvale Ave Los Angeles Ca 90031 Pv1. Installation of rooftop mounted, utility-interactive 4 kw pv s Date: January 12, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-010 | |||||
SCORE 86 8012 Reading Ave Los Angeles Ca 90045 Plan check for pv roof mounted system. System size: 3. 8kw with 13 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 147 98th St Los Angeles Ca 90003 Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: January 7, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-005 | |||||
SCORE 86 Date: March 23, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-102 | |||||
SCORE 86 2112 Johnston St Los Angeles Ca 90031 Pv1. Installation of 4. 2 kw pv system. (13) modules with (1) central Date: March 8, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-079 | |||||
SCORE 86 718 Avenue 64 Los Angeles Ca 90042 Plan check for a pv1 roof-mounted pv system. System size is 3. 2 kwac a Date: July 23, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-235 | |||||
SCORE 86 1412 Oak Grove Dr Los Angeles Ca 90041 Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: September 2, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-289 | |||||
SCORE 86 Date: March 23, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-102 | |||||
SCORE 86 Date: December 9, 2015 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-415 | |||||
SCORE 86 1254 Yosemite Dr Los Angeles Ca 90041 Plan check for a pv1 roof-mounted pv system. System size is 1. 3 kwac a Date: February 3, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 102 Saloma Ave Los Angeles Ca 91345 Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 Date: September 25, 2015 Contractor: Gerardo Salazar Permit status: Permit expired | Current use: Apartment | Permit id: 15041-20001-263 | |||||
SCORE 86 4352 Camero Ave Los Angeles Ca 90027 San Diego Ca Pv1. New solar system on existing residential roof-top. Total system s Date: November 25, 2015 Contractor: Gerardo Salazar Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-399 | |||||
SCORE 86 138 Valerio St Los Angeles Ca 91405 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 3. 8 kwac a Date: February 26, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-068 | |||||
SCORE 86 Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-038 | |||||
SCORE 86 11244 Erwin St Los Angeles Ca 91606 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 3 kwac and Date: October 27, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-359 | |||||
SCORE 86 8813 Murietta Ave Los Angeles Ca 91402 San Diego Ca Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: January 11, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-008 | |||||
SCORE 86 1135 84th St Los Angeles Ca 90044 San Diego Ca Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: February 26, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-068 | |||||
SCORE 86 4302 Bellingham Ave Los Angeles Ca 91604 San Diego Ca Pv1 sfd. Total system size 6kw ac using central inverter system. Using Date: July 10, 2015 Contractor: Gerardo Salazar Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 4513 Lennox Ave Los Angeles Ca 91423 San Diego Ca Pv1 sfd. Total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 Date: March 7, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-079 | |||||
SCORE 86 Date: October 30, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-235 | |||||
SCORE 86 6924 Balcom Ave Los Angeles Ca 91335 San Diego Ca Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: July 9, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-218 | |||||
SCORE 86 2112 Johnston St Los Angeles Ca 90031 San Diego Ca Pv1. Installation of 4. 2 kw pv system. (13) modules with (1) central Date: March 8, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-079 | |||||
SCORE 86 8517 Kester Ave Los Angeles Ca 91402 San Diego Ca Pv1. Install roof mounted pv system sized 4. 7 kw. Interconnected with Date: July 14, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-222 | |||||
SCORE 86 2326 Meadowvale Ave Los Angeles Ca 90031 San Diego Ca Pv1. Installation of rooftop mounted, utility-interactive 4 kw pv s Date: January 12, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-010 | |||||
SCORE 86 8012 Reading Ave Los Angeles Ca 90045 San Diego Ca Plan check for pv roof mounted system. System size: 3. 8kw with 13 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 4519 Lennox Ave Los Angeles Ca 91423 San Diego Ca Pv1 sfd total system size 6kw ac using central inverter system. Total Date: July 10, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-208 | |||||
SCORE 86 147 98th St Los Angeles Ca 90003 San Diego Ca Install a roof-mounted solar array on a sfd. Interconnect with a 200a Date: January 7, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-005 | |||||
SCORE 86 Date: March 23, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-102 | |||||
SCORE 86 Date: February 29, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-440 | |||||
SCORE 86 718 Avenue 64 Los Angeles Ca 90042 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 3. 2 kwac a Date: July 23, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-235 | |||||
SCORE 86 1412 Oak Grove Dr Los Angeles Ca 90041 San Diego Ca Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: September 2, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-289 | |||||
SCORE 86 Date: March 23, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-102 | |||||
SCORE 86 Date: December 9, 2015 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-415 | |||||
SCORE 86 1254 Yosemite Dr Los Angeles Ca 90041 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 1. 3 kwac a Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 102 Saloma Ave Los Angeles Ca 91345 San Diego Ca Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 142 82nd Pl Los Angeles Ca 90003 San Diego Ca Pv1. Install roof mounted pv system sized 3. 8 kw. Interconnected with Date: January 20, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-021 | |||||
SCORE 86 Date: December 9, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-415 | |||||
SCORE 86 Date: June 29, 2015 Contractor: Gerardo Salazar Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 15041-20001-198 | |||||
SCORE 86 Date: January 20, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-021 | |||||
SCORE 86 Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-038 | |||||
SCORE 86 521 Curson Ave Los Angeles Ca 90036 San Diego Ca Pv1, rooftop mounted solar system 3kw ac. Interconnected to (upgraded) Date: December 4, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 9627 Dorrington Ave Los Angeles Ca 91331 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 3. 8 kwac a Date: January 4, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 13226 Kismet Ave Los Angeles Ca 91342 San Diego Ca Pv1. New solar system on existing residential roof-top. Total system s Date: November 24, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-396 | |||||
SCORE 86 Date: January 15, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 11225 Allegheny St Los Angeles Ca 91352 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 7. 6 kwac a Date: March 7, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-076 | |||||
SCORE 86 23 Spaulding Ave Los Angeles Ca 90016 San Diego Ca Add sill plate anchor bolts and cripple wall plywood per la city stand Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15016-20000-185 | |||||
SCORE 86 19532 Gifford St Los Angeles Ca 91335 San Diego Ca Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 152 Roxford St Los Angeles Ca 91342 San Diego Ca Pv2 (apartment unit). Install roof mounted pv system sized 2. 2 kw. Int Date: September 18, 2015 Contractor: Gerardo Salazar Permit status: Refund completed | Current use: Apartment | Permit id: 15041-20000-263 | |||||
SCORE 86 6533 Bellingham Ave Los Angeles Ca 91606 San Diego Ca Installation of new roof mounted solar pv array. Total system size = Date: July 21, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-231 | |||||
SCORE 86 1156 1st St Los Angeles Ca 90731 San Diego Ca Pv1. New solar system on existing residential roof-top. Total system s Date: February 11, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-10000-049 | |||||
SCORE 86 5232 Elvira Road Los Angeles Ca 91364 San Diego Ca Pv1. Roofmounted solar system. System size: 6 kw ungrounded. Using 300 Date: January 4, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 1252 Yosemite Dr Los Angeles Ca 90041 San Diego Ca Plan check for a pv1 roof-mounted pv system. System size is 3. 9 kwac a Date: February 3, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-440 | |||||
SCORE 86 13441 Vose St Los Angeles Ca 91405 San Diego Ca Pv1, roof mounted solar panel, 6. 8kw (1) inverter: se6000a-us power op Date: November 10, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-378 | |||||
SCORE 86 10857 Blucher Ave Los Angeles Ca 91344 San Diego Ca Pv1, roof mounted solar 3. 8kw ac interconnected (upgrade) to 200a serv Date: December 4, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-408 | |||||
SCORE 86 6515 Murietta Ave Los Angeles Ca 91401 San Diego Ca Pv1 roof mounted solar installation. 3. 8kw ac system (17) sw275 mono b Date: December 7, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-410 | |||||
SCORE 86 Plan check for pv roof mounted system. System size: 3. 8kw with 14 modu Date: August 19, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-271 | |||||
SCORE 86 13317 Harding St Los Angeles Ca 91340 Pv1. New solar system on existing residential roof-top. Scope includes Date: November 25, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-399 | |||||
SCORE 86 Plan check for pv roof mounted system. System size: 5. 0kwac with mo Date: December 24, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-435 | |||||
SCORE 86 Plan check for pv roof mounted system. System size: 5. 0kw with 16 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 Plan check for pv roof monted. System size: 3. 8kw with 12 modules and Date: January 20, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 Date: January 25, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-026 | |||||
SCORE 86 Date: February 1, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-035 | |||||
SCORE 86 Date: January 29, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-034 | |||||
SCORE 86 Date: March 30, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-109 | |||||
SCORE 86 Date: March 25, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-105 | |||||
SCORE 86 9719 Kessler Ave Los Angeles Ca 91311 Plan check for pv roof mounted system. System size: 5. 0kwac with mo Date: December 24, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-435 | |||||
SCORE 86 Date: January 29, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-033 | |||||
SCORE 86 Date: April 11, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-125 | |||||
SCORE 86 Date: March 21, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-097 | |||||
SCORE 86 Date: March 11, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-086 | |||||
SCORE 86 1155 Heliotrope Dr Los Angeles Ca 90029 Plan check for pv roof mounted system. System size: 5. 0kw with 16 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 Date: February 1, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-035 | |||||
SCORE 86 Date: April 21, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-140 | |||||
SCORE 86 Date: April 13, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-128 | |||||
SCORE 86 Date: January 28, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-033 | |||||
SCORE 86 Date: April 13, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-128 | |||||
SCORE 86 16445 Tribune St Los Angeles Ca 91344 Plan check for pv roof mounted system. System size: 3. 8kw with 14 modu Date: August 19, 2015 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-271 | |||||
SCORE 86 Date: January 26, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-028 | |||||
SCORE 86 5518 Riverton Ave Los Angeles Ca 91601 Plan check for pv roof monted. System size: 3. 8kw with 12 modules and Date: January 20, 2016 Contractor: Gerardo Salazar Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 Date: March 25, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-106 | |||||
SCORE 86 Date: February 1, 2016 Contractor: Gerardo Salazar Permit status: Permit closed | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-035 | |||||
SCORE 86 16445 Tribune St Los Angeles Ca 91344 San Diego Ca Plan check for pv roof mounted system. System size: 3. 8kw with 14 modu Date: August 19, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-271 | |||||
SCORE 86 Date: April 11, 2016 Contractor: Gerardo Salazar Permit status: Refund completed | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-125 | |||||
SCORE 86 Date: January 26, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-028 | |||||
SCORE 86 Date: April 13, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-128 | |||||
SCORE 86 Date: April 21, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-140 | |||||
SCORE 86 5518 Riverton Ave Los Angeles Ca 91601 San Diego Ca Plan check for pv roof monted. System size: 3. 8kw with 12 modules and Date: January 20, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 13317 Harding St Los Angeles Ca 91340 San Diego Ca Pv1. New solar system on existing residential roof-top. Scope includes Date: November 25, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-399 | |||||
SCORE 86 Date: February 1, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-035 | |||||
SCORE 86 Date: April 13, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-128 | |||||
SCORE 86 Date: February 12, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-051 | |||||
SCORE 86 Date: January 25, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-026 | |||||
SCORE 86 Date: January 29, 2016 Contractor: Gerardo Salazar Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-034 | |||||
SCORE 86 Date: March 30, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-109 | |||||
SCORE 86 9719 Kessler Ave Los Angeles Ca 91311 San Diego Ca Plan check for pv roof mounted system. System size: 5. 0kwac with mo Date: December 24, 2015 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-435 | |||||
SCORE 86 Date: January 29, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-033 | |||||
SCORE 86 Date: March 21, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-097 | |||||
SCORE 86 Date: March 11, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-90000-086 | |||||
SCORE 86 1155 Heliotrope Dr Los Angeles Ca 90029 San Diego Ca Plan check for pv roof mounted system. System size: 5. 0kw with 16 modu Date: January 14, 2016 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 16041-20000-014 | |||||
SCORE 86 5325 Compton Ave Los Angeles Ca 90011 San Diego Ca Pv2. Install roof mounted pv system sized 3kw interconnected with uni Date: November 20, 2017 Contractor: Gerardo Salazar Permit status: Permit finaled | Current use: Apartment | Permit id: 17041-20000-362 |