ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Electrical Date: October 11, 2011 Contractor: Jack AlepyanPermit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 11041-90000-216 | |||||
SCORE 79 Pv1 single family dwelling. Using enphase microinverter. Using standar Date: April 11, 2014 Contractor: Jorge CalgoPermit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-096 | |||||
SCORE 86 Pv1, roof mounted solar panel, 6. 8kw (1) inverter: se6000a-us power op Date: November 10, 2015 Contractor: Gerardo SalazarPermit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-378 | |||||
SCORE 80 Add 5x7 inside (e) s. Pool per engineering design. Permit type: Swimming-pool/spa | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-069 | |||||
SCORE 80 Add 5x7 inside (e) s. Pool per engineering design. Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-069 | |||||
SCORE 79 Pv1 single family dwelling. Using enphase microinverter. Using standar Date: April 11, 2014 Contractor: Jorge CalgoPermit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-096 | |||||
SCORE 86 Pv1, roof mounted solar panel, 6. 8kw (1) inverter: se6000a-us power op Date: November 10, 2015 Contractor: Gerardo SalazarPermit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 15041-20000-378 |