QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 80 412 L Street Se Washington Dc Install new 36 inch high ornamental fence on north side of l st, se at 412 l st, se. Date: August 12, 2011 Contractor: Eya IncClient: Cindy Brooks | Permit type: Fixture; fence to 42" (open design) | Permit status: Revoked | Expiration date: July 28, 2012 | |||||
SCORE 80 Date: May 4, 2011 Contractor: Eya IncPermit status: 8 | Expiration date: July 29, 2011 | Permit id: Pa61622 | |||||
SCORE 80 Contractor: Eya IncPermit status: 5 | Expiration date: July 28, 2012 | Permit id: 0 | |||||
SCORE 80 3 329 Block Of I Street Se Washington Dc Install 37 new street lights and 9 new manholes for capitol quarter phase 2 adjacent to squares 798, 799 and 800. Removal of existing street lights (16). All locations are in southeast (se) to include: south side of 3 blk of eye st, east side of 9 - 11 blks of 3rd st, 9 - 10 blks of 3rd pl, west side of 9 - 11 blks of 4th st, 3 blk of k st, 3 blk of l st. Date: April 2, 2012 Contractor: Eya IncPermit status: Permit expired | Expiration date: March 29, 2013 | Permit id: Pa59597-R2 | |||||
SCORE 80 3 329 Block Of I Street Se Washington Dc Install 37 new street lights and 9 new manholes for capitol quarter phase 2 adjacent to squares 798, 799 and 800. Removal of existing street lights (16). All locations are in southeast (se) to include: south side of 3 blk of eye st, east side of 9 - 11 blks of 3rd st, 9 - 10 blks of 3rd pl, west side of 9 - 11 blks of 4th st, 3 blk of k st, 3 blk of l st. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 80 2801 2829 Block Of 5th Street Ne Washington Dc All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: March 29, 2013 | Permit id: 0 | |||||
SCORE 80 Contractor: Eya IncPermit status: 5 | Expiration date: July 28, 2012 | Permit id: 0 | |||||
SCORE 80 3 329 Block Of I Street Se Washington Dc Install 37 new street lights and 9 new manholes for capitol quarter phase 2 adjacent to squares 798, 799 and 800. Removal of existing street lights (16). All locations are in southeast (se) to include: south side of 3 blk of eye st, east side of 9 - 11 blks of 3rd st, 9 - 10 blks of 3rd pl, west side of 9 - 11 blks of 4th st, 3 blk of k st, 3 blk of l st. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 80 2801 2829 Block Of 5th Street Ne Washington Dc All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: March 29, 2013 | Permit id: 0 |