SCORE 74 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: May 9, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 30, 2012 | Permit id: Pa71914 | |||||
SCORE 74 Revision to issued permit pa71914. Changes to plans as bubbled and approved by dc water. Scope of work remains the same with revised plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; storm main line (trench) | Permit status: Cancel/withdrawn | Expiration date: December 21, 2012 | |||||
SCORE 74 1st - extension of permit number pa71914 (71914r1=74992); refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: February 22, 2013 | Permit id: Pa71914-R1 | |||||
SCORE 74 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: January 31, 2013 | |||||
SCORE 86 All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: December 20, 2012 Contractor: Ken Mallick Mallick Plumbing And Heating IncClient: Eya Inc | Permit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: March 29, 2013 | |||||
SCORE 74 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: January 31, 2013 | |||||
SCORE 74 Revision to issued permit pa71914. Changes to plans as bubbled and approved by dc water. Scope of work remains the same with revised plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; storm main line (trench) | Permit status: Cancel/withdrawn | Expiration date: December 21, 2012 | |||||
SCORE 74 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: May 9, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 30, 2012 | Permit id: Pa71914 | |||||
SCORE 86 All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: December 20, 2012 Contractor: Ken Mallick Mallick Plumbing And Heating IncClient: Eya Inc | Permit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: March 29, 2013 | |||||
SCORE 74 1st - extension of permit number pa71914 (71914r1=74992); refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: February 22, 2013 | Permit id: Pa71914-R1 | |||||
SCORE 79 Revision to issued permit pa71914. Changes to plans as bubbled and approved by dc water. Scope of work remains the same with revised plans. Date: September 4, 2012 Contractor: Sp Associates Iii, Llc C O Eya IncPermit type: Excavation; storm main line (trench) | Permit status: Cancel/withdrawn | Expiration date: December 21, 2012 | |||||
SCORE 79 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii, Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: January 31, 2013 | |||||
SCORE 86 All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: December 20, 2012 Contractor: Ken Mallick Mallick Plumbing And Heating, IncClient: Eya Inc | Permit type: Excavation; fire hydrant | Permit status: Cancel/withdrawn | Expiration date: March 29, 2013 | |||||
SCORE 66 Steel plate permit Contractor: Sp Associates I, Llc C O EyaPermit status: Notpaid | Expiration date: October 31, 2012 | Permit id: 0 | |||||
SCORE 75 Construction staging area Date: July 12, 2012 Contractor: Sp Associates Iii Llc C O EyaPermit status: Expired | Expiration date: October 5, 2012 | Permit id: Pa10065229 | |||||
SCORE 89 Construction staging area Date: March 15, 2013 Contractor: Eya Construction, Inc Adam HayesPermit status: Expired | Expiration date: April 30, 2013 | Permit id: Pa10082379-R1 | |||||
SCORE 75 Construction staging area Date: October 5, 2012 Contractor: Sp Associates Iii Llc C O EyaPermit status: Expired | Expiration date: November 30, 2012 | Permit id: Pa10065229-R1 | |||||
SCORE 86 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer ml (trench), excavation; valves (excavation), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; water ml (trench), excavation; storm main line (trench) Contractor: Ken Mallick Mallick Plumbing And Heating, IncPermit status: 3 | Expiration date: March 29, 2013 | Permit id: 0 | |||||
SCORE 79 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer ml (trench), excavation; storm main line (trench), excavation; valves (excavation), excavation; water lateral connection to 2" (trench), excavation; water ml (trench), excavation; water meter pit (to 2" pipe) Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: 3 | Expiration date: January 31, 2013 | Permit id: 0 | |||||
SCORE 79 Excavation; storm main line (trench) Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: 3 | Expiration date: December 21, 2012 | Permit id: 0 | |||||
SCORE 79 Revision to issued permit pa71914. Changes to plans as bubbled and approved by dc water. Scope of work remains the same with revised plans. Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: Cancel/withdrawn | Expiration date: December 21, 2012 | Permit id: 0 | |||||
SCORE 79 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: Cancel/withdrawn | Expiration date: January 31, 2013 | Permit id: 0 | |||||
SCORE 80 All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: March 29, 2013 | Permit id: 0 | |||||
SCORE 79 Excavation; storm main line (trench) Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: 3 | Expiration date: December 21, 2012 | Permit id: 0 | |||||
SCORE 79 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer ml (trench), excavation; storm main line (trench), excavation; valves (excavation), excavation; water lateral connection to 2" (trench), excavation; water ml (trench), excavation; water meter pit (to 2" pipe) Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: 3 | Expiration date: January 31, 2013 | Permit id: 0 | |||||
SCORE 86 Excavation; fire hydrant(s), excavation; manhole installation, excavation; sewer ml (trench), excavation; valves (excavation), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; water ml (trench), excavation; storm main line (trench) Contractor: Ken Mallick Mallick Plumbing And Heating, IncPermit status: 3 | Expiration date: March 29, 2013 | Permit id: 0 | |||||
SCORE 66 Steel plate- single location Contractor: Sp Associates I, Llc C O EyaPermit status: Notpaid | Expiration date: October 31, 2012 | Permit id: 0 | |||||
SCORE 66 Steel plate- single location Date: September 11, 2012 Contractor: Sp Associates I, Llc C O EyaPermit status: Expired | Expiration date: September 30, 2012 | Permit id: Pa10072790 | |||||
SCORE 66 Steel plate- single location Date: August 9, 2012 Contractor: Sp Associates I, Llc C O EyaPermit status: Expired | Expiration date: August 30, 2012 | Permit id: Pa10069313 | |||||
SCORE 79 Revision to issued permit pa71914. Changes to plans as bubbled and approved by dc water. Scope of work remains the same with revised plans. Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: Cancel/withdrawn | Expiration date: December 21, 2012 | Permit id: 0 | |||||
SCORE 79 1st - extension of permit number pa71914 (71914r1=74992); refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: September 4, 2012 Contractor: Sp Associates Iii, Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: February 22, 2013 | Permit id: Pa71914-R1 | |||||
SCORE 79 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Sp Associates Iii, Llc C O Eya IncPermit status: Cancel/withdrawn | Expiration date: January 31, 2013 | Permit id: 0 | |||||
SCORE 79 Refer to approved trafffic control plan (tcp) for permitted hours of work; all necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Date: May 9, 2012 Contractor: Sp Associates Iii, Llc C O Eya IncPermit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 30, 2012 | Permit id: Pa71914 | |||||
SCORE 80 All necessary water, sewer and storm work for phase three of saint paul townhomes. Work located in the 28 blk of 5th st, ne, the 4 blk of franklin st, ne, the intersection of those two streets and the public alley between 5th & 6th st, ne. Work includes new 18" storm, 8" water, new lateral connections to that water line along 5th st, new 8 " water in the alley, new 10" sanitary in the alley and all other work shown on the dc water approved plans. Contractor: Eya IncPermit status: Cancel/withdrawn | Expiration date: March 29, 2013 | Permit id: 0 | |||||
SCORE 89 Construction staging area Date: January 3, 2013 Contractor: Eya Construction, Inc Adam HayesPermit status: Permit expired | Expiration date: March 29, 2013 | Permit id: Pa10082379 |