QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 5119 Nannie Helen Burroughs Ave Ne, Washington, Dc 20019 Complete four soil borings to depths up to feet for the collection of soil and groundwater samples as part of property transaction. The soil borings will be will be backfilled immediately upon completion of drilling. No disturbed soils will be used to backfill the soil borings. Each soil boring location shall be tremie-grouted in one continuous operation from the bottom of the soil boring upward to the ground surface. A bentonite slurry mix will consist of at least two pounds bentonite powder to one gallon of water. The surface will be completed to match existing grade and materials. Lod is less than ft2 Date: February 28, 2017 Contractor: Dj DelandroClient: Dj Delandro | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700150 |