ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: October 26, 2004Permit status: Issued | Current use: Single family dwelling | Permit id: 363198 | |||||
Alarm system with low voltage devices Date: May 17, 2005Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 383607 | |||||
Electrical permit Date: September 13, 2007Permit status: Finaled | Current use: Single family dwelling | Permit id: 465455 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: March 11, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Residential accessorystructure | Permit id: 628229 | |||||
Existing residential - heavy-up, rough wiring, and fixtures note: permit revised - 10/09/2013 - low voltage devices added Date: August 23, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 646536 | |||||
New indoor/outdoor system and ductwork Date: June 24, 2013Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 639633 | |||||
Building residential permit Date: October 5, 2004 Value: $11,900Permit status: Issued | Current use: Single family dwelling | Permit id: 360529 | |||||
Sunroom and deck; 276-sqft. Date: July 3, 2007 Value: $32,690Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 457096 | |||||
Addition and interior renovations revision 4/4/13 Date: January 2, 2013 Value: $110,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 616995 | |||||
Remove overhead wire,make pole a urd cable,install cable in custmer built and associated equipment in accordance with pepco plan no. 3435623. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 11, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 310588 | |||||
Replacegas service in accordance with washington gas plan no. 179449. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have precons Date: July 23, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 297378 | |||||
Install cable and associated equipment in accordance with pepco plan no. 3432278. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row
|