Building Permits at Virginia Avenue Se And 6th Street Se Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Virginia Avenue Se And 6th Street Se Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
As a part of this task, we are planning to drill one soil test borings, using hollow stem augers of about eight inches is diameter, the boring will be extended to a maximum depth of feet below existing grade. Spt samples will be obtained at selected depth intervals. The borehole will be backfilled with a 60: bentonite:cement mix upon completion of sampling, on the same day of drilling. The investigation derived waste (idw) will stored in 55 gallon drums and will be tested and disposed off the by a licensed waste hauler. Drilling will take place in-between virginia avenue se and 6th st se, as per site plans, work plans report, dc well construction application, dc well schematic form, for district of columbia water and sewer authority. All drilling will be done under ddoe/wqd regulation.
Date:  December 4, 2013

Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 25, 2014 | Permit id: Pa89484
2013/12/04095Virginia Avenue Se And 6th Street Se Washington Dc
SCORE
89
As a part of this task, we are planning to drill one soil test borings, using hollow stem augers of about eight inches is diameter, the boring will be extended to a maximum depth of feet below existing grade. Spt samples will be obtained at selected depth intervals. The borehole will be backfilled with a 60: bentonite:cement mix upon completion of sampling, on the same day of drilling. The investigation derived waste (idw) will stored in 55 gallon drums and will be tested and disposed off the by a licensed waste hauler. Drilling will take place in-between virginia avenue se and 6th st se, as per site plans, work plans report, dc well construction application, dc well schematic form, for district of columbia water and sewer authority. All drilling will be done under ddoe wqd regulation.
Date:  December 4, 2013

Client: District Of Columbia Water & Sewer A. District Of Columbia Water & Sewer A. | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: April 25, 2014 | Permit id: Pa89484
2013/12/04089Virginia Avenue Se And 6th Street Se Washington DcFindling, Inc. Findling, Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.