ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556 Date: October 21, 2014 Value: $300Client: Pepco | Permit type: Excavation; electric | Permit id: Pa91675-R4 | |||||
The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads. Date: February 4, 2015Permit type: Fixture; traffic sig | |||||
SCORE 95 Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op Date: January 11, 2013 Contractor: Pepco Phi Holdings IncPermit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515 | |||||
SCORE 95 Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op Date: June 5, 2013 Contractor: Pepco Phi Holdings IncPermit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: August 19, 2013 | Permit id: Pa78515-R1 | |||||
SCORE 76 Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation. Date: June 9, 2013 Contractor: Mitch UptonPermit type: Fixture; sign (w/footings)(exception) | Permit status: Cancel/withdrawn | Expiration date: September 18, 2013 | |||||
SCORE 95 Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556 Date: February 5, 2014 Contractor: PepcoPermit type: Excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: May 7, 2014 | Permit id: Pa91675 | |||||
SCORE 78 The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads. Date: February 4, 2015 Contractor: Angel PaganPermit type: Fixture; traffic signal installation | Permit status: Cancel/withdrawn | Expiration date: June 30, 2015 | |||||
SCORE 95 Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op Date: January 11, 2013 Contractor: Pepco Phi Holdings, IncPermit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515 | |||||
SCORE 95 Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op Date: June 5, 2013 Contractor: Pepco Phi Holdings, IncPermit type: Excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: August 19, 2013 | Permit id: Pa78515-R1 | |||||
SCORE 95 Construction staging area Date: April 12, 2014 Contractor: PepcoPermit status: Expired | Expiration date: May 22, 2014 | Permit id: Pa10132363-R1 | |||||
SCORE 96 Enp for ddot contractors Date: June 13, 2013 Contractor: M.C. Dean, IncPermit status: Expired | Expiration date: July 19, 2013 | Permit id: Pa10101134 | |||||
SCORE 76 Construction staging area Contractor: Mitch UptonPermit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0 | |||||
SCORE 79 Other work related occupancy Contractor: Federal Highway AdministrationPermit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 95 Construction staging area Date: July 10, 2013 Contractor: PepcoPermit status: Expired | Expiration date: August 10, 2013 | Permit id: Pa10104439 | |||||
SCORE 79 Tv & film Date: May 2, 2013 Contractor: Vitaray Productions IiPermit status: Expired | Expiration date: May 4, 2013 | Permit id: Pa10095352 | |||||
SCORE 78 Fixture; traffic signal installation Contractor: Angel PaganPermit status: 3 | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 79 Tv & film Date: March 14, 2012 Contractor: Digital KitchenPermit status: Expired | Expiration date: March 27, 2012 | Permit id: Pa10052573 | |||||
SCORE 63 Enp for ddot contractors Date: October 7, 2014 Contractor: Ty Lin InternationalPermit status: Expired | Expiration date: January 30, 2015 | Permit id: Pa10162702 | |||||
SCORE 95 Construction staging area Date: May 9, 2014 Contractor: PepcoPermit status: Expired | Expiration date: June 22, 2014 | Permit id: Pa10132363-R2 | |||||
SCORE 66 Construction staging area Contractor: Virginia Department Of TransportationPermit status: Notpaid | Expiration date: July 3, 2013 | Permit id: 0 | |||||
SCORE 95 Construction staging area Contractor: PepcoPermit status: Notpaid | Expiration date: January 4, 2014 | Permit id: 0 | |||||
SCORE 76 Fixture; sign (w footings)(exception) Contractor: Mitch UptonPermit status: 3 | Expiration date: September 18, 2013 | Permit id: 0 | |||||
SCORE 63 Enp for ddot contractors Date: October 28, 2016 Contractor: Ty Lin InternationalPermit status: Expired | Expiration date: December 13, 2016 | Permit id: Pa10353178 | |||||
SCORE 76 Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation. Contractor: Mitch UptonPermit status: Cancel/withdrawn | Expiration date: September 18, 2013 | Permit id: 0 | |||||
SCORE 78 The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads. Contractor: Angel PaganPermit status: Cancel/withdrawn | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 76 Construction staging area Contractor: Mitch UptonPermit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0 | |||||
SCORE 66 Construction staging area Contractor: Virginia Department Of TransportationPermit status: Not paid | Expiration date: July 3, 2013 | Permit id: 0 | |||||
SCORE 95 Construction staging area Contractor: PepcoPermit status: Not paid | Expiration date: January 4, 2014 | Permit id: 0 | |||||
SCORE 95 Construction staging area Date: March 11, 2014 Contractor: PepcoPermit status: Permit expired | Expiration date: April 22, 2014 | Permit id: Pa10132363 | |||||
SCORE 79 Other work related occupancy Contractor: Federal Highway AdministrationPermit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 95 Build 14 1-way duct to connect rock creek parkway & i-66 with underground service due to conduit breakdown this construction permit requires a separate occupancy permit. The attached plans and conditions are a part of this permit. If steel plates are used at this job site an additional permit is needed. Wr3391896 tcp site specific cut#27908 (mdwalsh@pepco. Com 202-388-2256) mar 26 2013 5:01pm lpetrosian2 wrote for applicant - excavation all excavation operations shall comply with district department of transportation standards specifications for highways and structures sections 207 and 611. The contractor shall furnish, place and maintain all supports and shoring required for the sides of the excavation, to prevent damage to the work site or adjacent property. The size of the excavation shall be limited to the amount of work that can be properly placed and backfilled in a single day. All open excavations shall be properly barricaded to protect vehicles and pedestrians. All excavation op Date: March 28, 2013 Contractor: Pepco Phi Holdings, IncPermit status: Permit expired | Expiration date: June 20, 2013 | Permit id: Pa78515 | |||||
SCORE 76 Fixture; sign (w footings)(exception) Contractor: Mitch UptonPermit status: 3 | Expiration date: September 18, 2013 | Permit id: 0 | |||||
SCORE 95 Connect 1 theodore roosevelt bridge nw with underground service by building 65 of service conduit from an existing manhole; west of constitution avenue nw as indicated on the attached prints. Wr3435341 tcp 1,11,12 cut#28565 (akargbo@pepco. Com 202-388-2563) d. Moody 202-388-2556 Date: February 24, 2014 Contractor: PepcoPermit status: Permit expired | Expiration date: May 7, 2014 | Permit id: Pa91675 | |||||
SCORE 78 Fixture; traffic signal installation Contractor: Angel PaganPermit status: 3 | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 79 Other work related occupancy Contractor: Federal Highway AdministrationPermit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 76 Construction staging area Contractor: Mitch UptonPermit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0 | |||||
SCORE 95 Construction staging area Contractor: PepcoPermit status: Notpaid | Expiration date: January 4, 2014 | Permit id: 0 | |||||
SCORE 66 Construction staging area Contractor: Virginia Department Of TransportationPermit status: Notpaid | Expiration date: July 3, 2013 | Permit id: 0 | |||||
SCORE 76 Elite will remove 2 variable message signs on theodore roosevelt bridge for vdot, after signs have been refurbished with new compoinents they will be scheduled for reinstallation. Contractor: Mitch UptonPermit status: Cancel/withdrawn | Expiration date: September 18, 2013 | Permit id: 0 | |||||
SCORE 78 The project consist of mill and overlay asphalt pavement, full depth patch, remove and replace signs, steel-backed timber guardrails, concrete curb and gutter, install underdrains and other miscellaneous work. Most of the work will be on the ramps to the spout run parkway which is a national park service road but there are some construction and temporary traffic control signs that will be at the adjacent roads which are dc roads. Contractor: Angel PaganPermit status: Cancel/withdrawn | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 95 Construction staging area Date: May 2, 2013 Contractor: PepcoPermit status: Permit expired | Expiration date: June 11, 2013 | Permit id: Pa10094728 | |||||
SCORE 79 Tv & film Date: April 30, 2013 Contractor: Vitaray Productions IiPermit status: Permit expired | Expiration date: May 5, 2013 | Permit id: Pa10091105 | |||||
SCORE 66 Construction staging area Contractor: Virginia Department Of TransportationPermit status: Not paid | Expiration date: July 3, 2013 | Permit id: 0 | |||||
SCORE 76 Construction staging area Contractor: Mitch UptonPermit status: Revoked | Expiration date: September 27, 2013 | Permit id: 0 | |||||
SCORE 66 Construction staging area Date: August 5, 2013 Contractor: Virginia Department Of TransportationPermit status: Permit expired | Expiration date: October 31, 2013 | Permit id: Pa10107466 | |||||
SCORE 95 Construction staging area Contractor: PepcoPermit status: Not paid | Expiration date: January 4, 2014 | Permit id: 0 | |||||
SCORE 79 Other work related occupancy Contractor: Federal Highway AdministrationPermit status: Rejected | Expiration date: June 30, 2015 | Permit id: 0 | |||||
SCORE 84 Tv & film Date: November 11, 2016 Contractor: Thinkfilm, IncPermit status: Permit expired | Expiration date: November 13, 2016 | Permit id: Pa10354979 |