ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: June 15, 2012Permit status: Issued | Current use: Single family dwelling | Permit id: 602230 | |||||
Electrical permit Date: July 16, 2014Permit status: Issued | Current use: Single family dwelling | Permit id: 680672 | |||||
Replace in same location/size Date: April 16, 2010Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 535375 | |||||
Finish basement Date: May 9, 2012 Value: $15,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 598380 | |||||
Porch Date: April 13, 2001 Value: $2,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 245419 | |||||
Building residential permit Date: October 7, 2008 Value: $1,800Permit status: Finaled | Current use: Deck | Permit id: 497405 | |||||
Abandongas service in accordance with washington gas plan no. 632245. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 7, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 352040 |