ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
An application by seattle public utilities (spu) for a hearing examiner site plan review a hearing examiner variance hearing examiner conditional use permit and a shoreline substantial development permit to construct a temporary salmon broodstock collection facility on the cedar river. The site will be used to collect adult sockeye salmon from mid-september to mid-december. All structures would be removed when the collection site isnt in use. The temporary weir facility consists of a removable "fence" spanning the width of the river salmon collection traps and crane. The facility would be located (approximately) at river mile 1. 7 upstream of the i-405 crossing. The collection site would require building an access road loading area and driveway within a designated shoreline of the state. Construction of the road would require approximately 3 cubic yards of fill and removing 5 trees in a critical area (shoreline area) for which the applicant submitted a restoration/mitigation plan. The s Date: March 3, 2008Client: City Of Renton | Permit type: Site development | Permit status: Approved | Expiration date: August 21, 2023 | Permit id: Lua08-018 | Parcel: 1723059014 | |||||
An application by seattle public utilities (spu) for a hearing examiner site plan review a hearing examiner variance hearing examiner conditional use permit and a shoreline substantial development permit to construct a temporary salmon broodstock collection facility on the cedar river. The site will be used to collect adult sockeye salmon from mid-september to mid-december. All structures would be removed when the collection site isnt in use. The temporary weir facility consists of a removable "fence" spanning the width of the river salmon collection traps and crane. The facility would be located (approximately) at river mile 1. 7 upstream of the i-405 crossing. The collection site would require building an access road loading area and driveway within a designated shoreline of the state. Construction of the road would require approximately 3 cubic yards of fill and removing 5 trees in a critical area (shoreline area) for which the applicant submitted a restoration mitigation plan. The s Date: March 3, 2008Client: City Of Renton | Permit type: Site development | Permit status: Approved | Expiration date: August 21, 2023 | Permit id: Lua08-018 | Parcel: 1723059014 |