Based on the information received from building department, associated with South Bank Of The Cedar River Under The Renton WA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
An application by seattle public utilities (spu) for a hearing examiner site plan review a hearing examiner variance hearing examiner conditional use permit and a shoreline substantial development permit to construct a temporary salmon broodstock collection facility on the cedar river. The site will be used to collect adult sockeye salmon from mid-september to mid-december. All structures would be removed when the collection site isnt in use. The temporary weir facility consists of a removable "fence" spanning the width of the river salmon collection traps and crane. The facility would be located (approximately) at river mile 1. 7 upstream of the i-405 crossing. The collection site would require building an access road loading area and driveway within a designated shoreline of the state. Construction of the road would require approximately 3 cubic yards of fill and removing 5 trees in a critical area (shoreline area) for which the applicant submitted a restoration/mitigation plan. The s
Date:  March 3, 2008

Client: City Of Renton | Permit type: Site development | Permit status: Approved | Expiration date: August 21, 2023 | Permit id: Lua08-018 | Parcel: 1723059014
2008/03/03095South Bank Of The Cedar River Under The Renton Wa
An application by seattle public utilities (spu) for a hearing examiner site plan review a hearing examiner variance hearing examiner conditional use permit and a shoreline substantial development permit to construct a temporary salmon broodstock collection facility on the cedar river. The site will be used to collect adult sockeye salmon from mid-september to mid-december. All structures would be removed when the collection site isnt in use. The temporary weir facility consists of a removable "fence" spanning the width of the river salmon collection traps and crane. The facility would be located (approximately) at river mile 1. 7 upstream of the i-405 crossing. The collection site would require building an access road loading area and driveway within a designated shoreline of the state. Construction of the road would require approximately 3 cubic yards of fill and removing 5 trees in a critical area (shoreline area) for which the applicant submitted a restoration mitigation plan. The s
Date:  March 3, 2008

Client: City Of Renton | Permit type: Site development | Permit status: Approved | Expiration date: August 21, 2023 | Permit id: Lua08-018 | Parcel: 1723059014
2008/03/03095South Bank Of The Cedar River Under The Renton Wa
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.