ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Must have preconstruction meeting with dps row inspector prior to construction. Construct two mc-301. 03 type driveways, storm drain (str. M-12, m-13, m-14, i-15, ex i-20, ex m-22), concrete sidewalk, concrete curb and gutter, and street paving as per approved mc standards and specifications and approved plans. Install 8" sewer line in accordance with wssc plans and specifications. Prior to placement of any curb & gutter or pavement, all utility crossings must be certified as being in place. Place permanent reference monuments and property line markers on all lots and parcels abutting the streets covered by this permit, per section 50-24(e) of the mc-code. Install street lights in accordance with plans approved by mc-dot. Plant street trees in accordance with mc-code, sec. 49-33(j).&nbs Date: December 11, 2013Permit type: Public right of way | Permit status: Completed | Current use: Paving and storm drain | Permit id: 298488 |