Building Permits at Hillbrook Lane Nw And 49th Street Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with Hillbrook Lane Nw And 49th Street Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
The proposed work consist on drilling two test soil borings on hillbrook lane nw. The borings diameter is eight inches by five feet depth below existing grade using hollow stem augers. The test borings will be backfilled (i. E., abondoned) using a 60: bentonite: cement mix: i. E., 150lbs of bentonite and 94lbs of cement hydrated with 82 gallons of water, immediately following completion of sampling operations. All work will be executed under ddot regulation, as per site plans, work plans report, ddoe/construction well and schematic forms for dc wasa/dc water. Work will be performed on hillbrook lane nw and 49th street nw.
Date:  May 16, 2014

Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 14, 2014 | Permit id: Pa95618
2014/05/16095Hillbrook Lane Nw And 49th Street Nw Washington Dc
SCORE
89
The proposed work consist on drilling two test soil borings on hillbrook lane nw. The borings diameter is eight inches by five feet depth below existing grade using hollow stem augers. The test borings will be backfilled (i. E., abondoned) using a 60: bentonite: cement mix: i. E., 150lbs of bentonite and 94lbs of cement hydrated with 82 gallons of water, immediately following completion of sampling operations. All work will be executed under ddot regulation, as per site plans, work plans report, ddoe construction well and schematic forms for dc wasa dc water. Work will be performed on hillbrook lane nw and 49th street nw.
Date:  May 16, 2014

Client: District Of Columbia Water & Sewer A. District Of Columbia Water & Sewer A. | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 14, 2014 | Permit id: Pa95618
2014/05/16089Hillbrook Lane Nw And 49th Street Nw Washington DcFindling, Inc. Findling, Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.