Building Permits at 99999 Woodhill Dr, Asheville, NC 28801


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 99999 Woodhill Dr, Asheville, NC 28801 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Comment date: mon sep 27 00:00: edt 2004 - woodland ave - major subdivision lots p&z#04-6010; comment date: wed jan 12 00:00: est 2005 - received driveway app, grading and stormwater apps sfb; comment

Client: Woodland Ave | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 04-04842 | Parcel: 1449578
09599999 Woodhill Dr, Asheville, Nc 28801
Woodland major subdivison

Client: Major Subdivision | Permit type: Major subdivision | Permit status: Under review | Current use: Subdivision | Permit id: 04-60000010pz
09599999 Woodhill Dr, Asheville, Nc 28801
Woodland ave - major subdivision lots p&z#04-6010; received driveway app, grading and stormwater apps sfb; sent refund request for stormwater fee, not required per ryon plancer. Pmd; recd revised site plans. Pmd; 1. Application is for residential street 2. Entrance apron for street access shall be constructed of concrete or asphalt. 3. For residential streets, paved area shall be 22 wide. Maximum turning radius shall be 20. 4. Inspector must be called 72 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is john fly and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 62 wide at the edge of the roadway. This measurement includes the radius. 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. 10. If removal of trees is required in right-of-way for placement of the driveway please contact mark foster at redac

Permit type: Planning level i | Permit status: Issued | Permit id: 04-04842 | Parcel: 1449578
09599999 Woodhill Dr, Asheville, Nc 28801
Woodland ave - major subdivision lots p&z#04-6010; comment date: wed jan 12 00:00: est 2005 - received driveway app, grading and stormwater apps sfb; comment
Date:  April 18, 2005

Client: Woodland Ave | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 04-04842 | Parcel: 1449578
2005/04/1809599999 Woodhill Dr, Asheville, Nc 28801
Woodland major subdivison
Date:  September 27, 2004

Client: Major Subdivision | Permit type: Major subdivision | Permit status: Under review | Current use: Subdivision | Permit id: 04-60000010pz
2004/09/2709599999 Woodhill Dr, Asheville, Nc 28801
Woodland ave - major subdivision lots p&z#04-6010; received driveway app, grading and stormwater apps sfb; sent refund request for stormwater fee, not required per ryon plancer. Pmd; recd revised site plans. Pmd; 1. Application is for residential street 2. Entrance apron for street access shall be constructed of concrete or asphalt. 3. For residential streets, paved area shall be 22 wide. Maximum turning radius shall be 20. 4. Inspector must be called 72 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is john fly and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 62 wide at the edge of the roadway. This measurement includes the radius. 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. 10. If removal of trees is required in right-of-way for placement of the driveway please contact mark foster at redac
Date:  April 18, 2005

Permit type: Planning level i | Permit status: Issued | Permit id: 04-04842 | Parcel: 1449578
2005/04/1809599999 Woodhill Dr, Asheville, Nc 28801
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.