ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
6000 Client: Riverbend Phase Iii | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 04-03703 | Parcel: 587788 | |||||
Recd landscape plans - sent 1 to planning and 2 to engineering. Pmd river bend business park phase iii; stand alone driveway permit applied for by harley dunn redacted phone number. Lcs; provisional grading/drainage conditions 1. Npdes permit required for sites of land disturbance greater than or equal to 1 acre. 2. Site must stay in compliance with all federal, stat e and l ocal regulations. If site falls out of compliance for any of the agencys stated above, the project stands the chance of having a notice of violation issued against the project to shutting down the job and retracting the app roval for thel and disturbance. Please stay in compliance. 3 . If any of the minimum best management practices fail t o adequately keep sedimentation or stormwater on the site, it shall be the responsibility of the professional designer of record to supply the contractor/owner with a correction, as well as submit correc tion to the stormwater/erosion control office for approval. 4. I Permit type: Planning level i | Permit status: Issued | Permit id: 04-03703 | Parcel: 587788 | |||||
6000 Date: May 14, 2009Client: Riverbend Phase Iii | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 04-03703 | Parcel: 587788 | |||||
Recd landscape plans - sent 1 to planning and 2 to engineering. Pmd river bend business park phase iii; stand alone driveway permit applied for by harley dunn redacted phone number. Lcs; provisional grading drainage conditions 1. Npdes permit required for sites of land disturbance greater than or equal to 1 acre. 2. Site must stay in compliance with all federal, stat e and l ocal regulations. If site falls out of compliance for any of the agencys stated above, the project stands the chance of having a notice of violation issued against the project to shutting down the job and retracting the app roval for thel and disturbance. Please stay in compliance. 3 . If any of the minimum best management practices fail t o adequately keep sedimentation or stormwater on the site, it shall be the responsibility of the professional designer of record to supply the contractor owner with a correction, as well as submit correc tion to the stormwater erosion control office for approval. 4. I Date: May 14, 2009Permit type: Planning level i | Permit status: Issued | Permit id: 04-03703 | Parcel: 587788 |