Building Permits at 99999 Reed St, Asheville, NC 28803


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 99999 Reed St, Asheville, NC 28803 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Date:  December 12, 2001

Permit status: Issued | Permit id: 01-05329
2001/12/1209599999 Reed St, Asheville, Nc 28803
Comment date: wed dec 12 00:00: est 2001 - building demolition. Asheville fire department to burn for training purposes.; comment date: wed dec 12 00:00: est 2001 - wnc air pollution approved by mike

Client: Carter -Afd Training Burn | Permit type: Res: demolition | Permit status: Expired | Current use: Residential | Permit id: 01-05329 | Parcel: 405598
09599999 Reed St, Asheville, Nc 28803
Carter driveway permit

Client: Carter Driveway Permit | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 07-01010 | Parcel: 405598
09599999 Reed St, Asheville, Nc 28803
March 1, 2007 3:49:35 pm bdavis driveway permit request.; unclear of addresses for existing house and where this new driveway will be accessed from. Aom; 1. Driveway apron shall be constructed of asphalt. 2 . Driveway apron must extend from end of wilson street to a minimum of 5? Past property line. 3. The inspector must be called 48 hours prior to ins tallation of the driveway access apron for an inspection of the forms or prepared area. 4. D riveway aprons that serve single family units must be buil t in accordance with one of the following designs. (#1) 6? ? 40 psi concrete on 100% compacted 6? Cabc, or (#2) 2? ? Type ii asphalt on 6? 100% compacted cabc stone. If the roadway has curb and gutter and/or sidewalk the driv eway apron must concrete. If sidewalk is present the driv eway apron must extend a minimum of feet past sidewalk. This foot section must be paved either with asphalt or concrete. 5. Inspector for this project is the east area inspector, h e can be reached at redacted pho

Permit type: Planning level i | Permit status: Issued | Permit id: 07-01010 | Parcel: 405598
09599999 Reed St, Asheville, Nc 28803
Building demolition. Asheville fire department to burn for training purposes.; comment date: wed dec 12 00:00: est 2001 - wnc air pollution approved by mike
Date:  June 3, 2015

Client: Carter -Afd Training Burn | Permit type: Res: demolition | Permit status: Expired | Current use: Residential | Permit id: 01-05329 | Parcel: 405598
2015/06/0309599999 Reed St, Asheville, Nc 28803
Carter driveway permit
Date:  March 7, 2007

Client: Carter Driveway Permit | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 07-01010 | Parcel: 405598
2007/03/0709599999 Reed St, Asheville, Nc 28803
March 1, 2007 3:49:35 pm bdavis driveway permit request.; unclear of addresses for existing house and where this new driveway will be accessed from. Aom; 1. Driveway apron shall be constructed of asphalt. 2 . Driveway apron must extend from end of wilson street to a minimum of 5? Past property line. 3. The inspector must be called 48 hours prior to ins tallation of the driveway access apron for an inspection of the forms or prepared area. 4. D riveway aprons that serve single family units must be buil t in accordance with one of the following designs. (#1) 6? ? 40 psi concrete on 100% compacted 6? Cabc, or (#2) 2? ? Type ii asphalt on 6? 100% compacted cabc stone. If the roadway has curb and gutter and or sidewalk the driv eway apron must concrete. If sidewalk is present the driv eway apron must extend a minimum of feet past sidewalk. This foot section must be paved either with asphalt or concrete. 5. Inspector for this project is the east area inspector, h e can be reached at redacted pho
Date:  March 7, 2007

Permit type: Planning level i | Permit status: Issued | Permit id: 07-01010 | Parcel: 405598
2007/03/0709599999 Reed St, Asheville, Nc 28803
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.