Demo/rebuild Date: February 27, 2014Permit type: Demolition or move p | Permit status: Issued | Current use: Single family dwelling | Permit id: 660289 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: June 10, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: May 11, 2015 | Current use: Single family dwelling | Permit id: 676093 | |||||
Residential demo/rebuild - new heating/cooling equip & ductwork Date: July 15, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: May 11, 2015 | Current use: Single family dwelling | Permit id: 680453 | |||||
Demo / rebuild Date: March 10, 2014 Value: $350,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 651348 | |||||
Temporarily place a dumpster within the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters in the public right of way. Dumpster locations, barricades and/or lights are to be placed as directed by the dps inspector. Date: April 19, 2004Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 229031 | |||||
Replace poles. Dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3442592. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 9, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 313410 | |||||
Install gas service in accordance with washington gas plan no. 341453. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work Date: July 18, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 318077 | |||||
Construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 Date: June 25, 2003Permit type: Public right of way | Permit status: Finaled | Current use: Driveway | Permit id: 222727 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Replace a dot approved 1. 5" caliper minor tree between october and april as directed by dot. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces
|