ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition/rebuild Date: September 10, 2012Permit type: Demolition or move p | Permit status: Completed | Completion date: September 26, 2012 | Current use: Single family dwelling | Permit id: 602631 | |||||
Mechanical permit Date: November 28, 2012Permit status: Finaled | Completion date: April 9, 2013 | Current use: Single family dwelling | Permit id: 619140 | |||||
Temp pole service -100amp Date: July 19, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 605560 | |||||
Demolition/rebuild Date: September 10, 2012 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 602628 | |||||
Bore roadway, dig and backfill trench, build conduit, and install cable and associated equipment in accordance with pepco plan no. 3390124. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: September 17, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 279789 | |||||
Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission
|