ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Sprinkler-replace (2) existing fire pumps with (2) new larger fire pumps. Install new fire sprinkler system in pump house. Date: March 24, 2015Permit type: Intake | Permit status: Approved | Completion date: February 20, 2015 | Permit id: 2015-122632-000 | |||||
Street tree pruning permit Date: May 21, 2015Permit type: D - permit request | Permit status: Permit issued | Completion date: May 21, 2015 | Permit id: 2015-167227-000 | |||||
Installation of new 1 gallon double-wall diesel fuel tank within fire pump building, anchoring for tank Date: June 5, 2015Permit type: Application | Permit status: Approved | Completion date: May 28, 2015 | Permit id: 2015-176921-000 | |||||
Approval of a greenway review to install a 90,0 gallon butane storage tank, and create a pipe delivery system with 2 elevated bridges that allow passage over the existing railroad tracks, per the approved site plans, exhibits c. 2 through c. 4, signed and dated november 10, 2014, subject to the following conditions. A. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 2, c. 3, and c. 4. The sheets on which this information appears must be labeled proposal and design as approved in case file # lu 14-211709 gw. No field changes allowed. B. Three 1. 5-caliper inch trees, as well as the two trees required by the bureau of parks and recreation, urban forestry division, shall be planted on the far west side of the 90,0 gallon butane tank, and adjacent to the greenway trail as depicted on exhibit c. 4. All five trees must be native and Date: November 20, 2014Permit type: Land use review | Permit status: Completed | Completion date: September 15, 2014 | Permit id: 2014-211709-000 | |||||
Private property tree removal permit Date: October 16, 2014Permit type: D - permit request | Permit status: Permit issued | Completion date: October 16, 2014 | Permit id: 2014-216991-000 | |||||
Lucs for waterway lease application Permit type: Land use review | Permit status: Closed | Completion date: November 5, 2015 | Permit id: 2015-261191-000 | |||||
Lucs for waterway lease application Permit type: Land use review | Permit status: Letter sent | Completion date: November 18, 2015 | Permit id: 2015-261191-000 | |||||
Remote telemetry flow and pressure signals Date: March 4, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130755-000 | |||||
Owrd lucs for use of willamette river water to hydro-test repaired bulk storage tank. Permit type: Land use review | Permit status: Closed | Completion date: April 24, 2008 | Permit id: 2008-121170-000 | |||||
Owrd lucs for use of willamette river water to hydro-test repaired bulk storage tank. Permit type: Land use review | Permit status: Letter sent | Completion date: April 24, 2008 | Permit id: 2008-121170-000 | |||||
State epermit 59000-bel-13-00192: install (2) branch circuits for fire alarm panel. Faxed Date: March 27, 2013Permit type: Administration | Permit status: Closed | Completion date: March 27, 2013 | Permit id: 2013-132699-000 | |||||
Lucs for waterway lease application Permit type: Land use review | Permit status: Closed | Completion date: November 5, 2015 | Permit id: 2015-261191-000 | |||||
Lucs for waterway lease application Permit type: Land use review | Permit status: Letter sent | Completion date: November 18, 2015 | Permit id: 2015-261191-000 | |||||
Owrd lucs for use of willamette river water to hydro-test repaired bulk storage tank. Permit type: Land use review | Permit status: Closed | Completion date: April 24, 2008 | Permit id: 2008-121170-000 | |||||
Owrd lucs for use of willamette river water to hydro-test repaired bulk storage tank. Permit type: Land use review | Permit status: Letter sent | Completion date: April 24, 2008 | Permit id: 2008-121170-000 | |||||
04-03-07 scb - increase in scope of work phase ii -(added value- see comments) to include remove the revetment petroleum contaminated soils beneath the revetmentand riverward petroleum contaminated sediment, back fill excavation with clean material, shoreline restoration, install tieback anchors in new seawall (original work - new sheet pile seawall) Date: June 11, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 25, 2012 | Current use: Business | Permit id: 2006-138957-000 | |||||
Drill containment wells, manifold together for spill containment, 2 locations Date: December 9, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 1, 2005 | Current use: Factory/industrial | Permit id: 2004-067723-000 |