ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt 3: as per the requirements contract with hpd, provide and install (8) window guards throughout entire apartment. Remove all work related debr Date: June 21, 2012Permit type: Gc | Permit id: Ec31499 | |||||
Remove existing heat plant and install new boiler. Install new cast iron/ steel #2 oil boiler to supply adequate heat and hot water to building. Sup Date: January 11, 2006Permit type: Heat | Permit id: E620567 | |||||
As per mini rc # 2006000099702 (environmental management solutions) perform air sampling and analysis in accordance with hpd mini requirement contract Date: January 23, 2006Permit type: Asbest | Permit id: E620758 | |||||
As per mini rc#2006000093402 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 02 samples for asbestos content utilizi Date: January 12, 2006Permit type: Asbest | Permit id: E620754 | |||||
As per rc # 2005002889802 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 114 ft. Of pipe i Date: January 12, 2006Permit type: Asbest | Permit id: E620756 | |||||
Remove existing heat plant and install new boiler. Install new cast iron steel #2 oil boiler to supply adequate heat and hot water to building. Sup Date: January 11, 2006Permit type: Heat | Permit id: E620567 | |||||
Vacuum clean boiler, breeching and base of chimney. Blow back oil lines and restore boiler to proper working order. Restore hot water to building. Date: November 10, 2005Permit type: Heat | Permit id: E613732 | |||||
(apt. #3fl) trace, locate, and repair cascading water leak at kitchen. Demolish and repair damaged kitchen ceiling 119 sq. Ft., north wall 122 sq. F Date: February 2, 2007Permit type: Gc | Permit id: E719840 | |||||
Apt 3fl) trace, and repair all conceald roof or exterior wall leaks affecting the third floor apt. Demo./replace all defective ceilings and walls thr Date: July 11, 2006Permit type: Gc | Permit id: E700242 | |||||
Public hall: repair entire roof approx (400sq. Ft.) install new (90lbs) capsheet flashing roof cement flash all parapet walls and flash around chimney Date: August 2, 2006Permit type: Gc | Permit id: E703393 | |||||
(apt. #3fl) make all necessary repairs to # 2 oil burner and restore to proper working order. Ensure adequate heat and hot water to entire building. Date: July 19, 2006Permit type: Heat | Permit id: E701140 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately to esb fuel unit. 212-863-7830 Date: January 9, 2007Permit type: Util | Permit id: E717709 | |||||
Apt 3fl) trace, and repair all conceald roof or exterior wall leaks affecting the third floor apt. Demo. Replace all defective ceilings and walls thr Date: July 11, 2006Permit type: Gc | Permit id: E700242 | |||||
At building rear yard: remove approx. 25 cubic yard of refuse / rubbish to including all shrub and old building material. Remove all work related Date: May 31, 2012Permit type: Gc | Permit id: Ec30379 | |||||
At building rear yard: remove approx. 25 cubic yard of refuse rubbish to including all shrub and old building material. Remove all work related Date: May 31, 2012Permit type: Gc | Permit id: Ec30379 | |||||
Provide single fuel drop with prime and start. #2 fuel. Fill tank. Please report any problems immediately esb fuel unit. 212-863-8779 Date: September 26, 2006Permit type: Util | Permit id: E708798 | |||||
Erp doh lead violation: rc# 2008000032101 and attached scope of work thoroughly remove all lead violations as per new york city health order to abate Date: June 25, 2008Permit type: Delead | Permit id: E835828 |