ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector chris cary @ 301-370-3686. Pepco #5522099 - relocate pole out of sidewalk for mcdpw&t cip #506747. Utility pole(s) to be replaced or relocated shall be placed at the property line or to the maximum distance from the roadway. Minimum distances are: six feet (6") behind curb and gutter on closed section roadways. Three feet (3) behind invert of ditch on open section roadways or a minimum of twelve feet (12) from the edge of pavement, whichever is greater. Maintan two feet of clearance between outside edge of sidewalk and utility poles. Notify mc. Dps inspector when work is complete utility representative: cindy loveless @ 202-872-2608. Date: October 28, 2003Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 224965 |