ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo bond tracking ps11a44984 Date: July 11, 2011Permit type: Demolition or move p | Permit status: Finaled | Completion date: April 3, 2012 | Current use: Single family dwelling | Permit id: 570049 | |||||
Rebuild Date: July 21, 2011 Value: $350,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 570050 | |||||
Electrical permit Date: November 30, 2011Permit status: Finaled | Current use: Single family dwelling | Permit id: 585767 | |||||
Electrical permit Date: January 5, 2012Permit status: Issued | Current use: Single family dwelling | Permit id: 588259 | |||||
Building permit:570050 Date: November 17, 2011Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 584908 | |||||
Outdoor wood deck Date: April 5, 2012Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 595371 | |||||
Install riser and cable to provide 400amp underground service and associated equipment in accordance with pepco plan no. 3365874. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: October 14, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 271605 | |||||
Dw permit: construct mc-301. 01 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: July 1, 2011Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 269807 | |||||
Install gas service in accordance with washington gas plan no. 130898. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: July 29, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 270709 |