| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Building-341490 Date: July 16, 2004Permit type: Electrical permit | Permit status: Finaled | Completion date: August 23, 2005 | Current use: Single family dwelling | Permit id: 351912 | |||||
Electrical permit Date: May 18, 2007Permit status: Issued | Current use: Single family dwelling | Permit id: 453921 | |||||
Porch, bay window, and interior alterations Date: April 26, 2007 Value: $80,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 450239 | |||||
Building residential Date: May 11, 2004 Value: $75,000Permit status: Finaled | Completion date: August 23, 2005 | Current use: Single family dwelling | Permit id: 341490 | |||||
Clendenin residence pv system-ap #600725 6. 72kw system, 28 modules w/microinverters, accumulater panel w/2-20amp breakers,35 amp breaker in 200amp mcb panel Date: June 11, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 601158 | |||||
Mechanical permit Date: August 18, 2004Permit status: Finaled | Current use: Single family dwelling | Permit id: 355397 | |||||
Building residential permit Date: June 11, 2012 Value: $24,800Permit status: Finaled | Current use: Single family dwelling | Permit id: 600725 | |||||
Replacegas service in accordance with washington gas plan no. 589575. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 22, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 348237 |