ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition or move p Date: July 30, 2012Permit status: Completed | Completion date: August 28, 2012 | Current use: Single family dwelling | Permit id: 600293 | |||||
See dwgs and application for sq ftg analysis Date: July 30, 2012 Value: $2,500,000Permit type: Building residential | Permit status: Stop work | Completion date: June 12, 2013 | Current use: Single family dwelling | Permit id: 600297 | |||||
400amp new service Date: October 1, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 613300 | |||||
Generator Date: May 10, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 634628 | |||||
Dig and backfill trench, build conduit, and install cable and associated equipment in accordance with pepco plan no. 3390474. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: September 4, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 279182 |