Add (1) 120v circuit for wireless tank indicators Date: July 6, 2015Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196531-000 | |||||
Sprinkler-disconnect & remove three sprinklers, (fire monitors), from service at yard #5. Date: September 10, 2014Permit type: Intake | Permit status: Approved | Completion date: September 10, 2014 | Permit id: 2014-210548-000 | |||||
Wo14527 pm3 nustar energy - p3circuit and connect p3 heat pumpbryan barker 971-235-3194 Date: September 17, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 3, 2014 | Permit id: 2014-213990-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Application | Permit status: Approved | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Issuance/intake | Permit status: Intake | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Process management | Permit status: Closed | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Process management | Permit status: Closed | Completion date: December 7, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Addressing | Permit status: Not reqd | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Site development | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Life safety | Permit status: Approved | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Life safety | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Structural | Permit status: Approved | Completion date: December 17, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Structural | Permit status: Required | Completion date: December 17, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Fire bureau | Permit status: Approved | Completion date: December 24, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Environmental services | Permit status: Approved | Completion date: March 16, 2016 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Environmental services | Permit status: Approved | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Transportation | Permit status: Not reqd | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Water bureau review | Permit status: Not reqd | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Parks bureau | Permit status: Approved | Completion date: December 10, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump is used to regulate fuel between the two tanks. Cover/slab under 15-273373-co. Permit type: Intake | Permit status: Approved | Completion date: December 7, 2015 | Permit id: 2015-273382-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump is used to regulate fuel between the two tanks. Cover/slab under 15-273373-co. Permit type: Mechanical review | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2015-273382-000 | |||||
Low voltage cabling and wireless networkfaxed Date: April 27, 2012Permit type: Electrical inspections | Permit status: Approved | Completion date: August 13, 2012 | Permit id: 2012-135913-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Application | Permit status: Approved | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Issuance/intake | Permit status: Intake | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Process management | Permit status: Closed | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Process management | Permit status: Closed | Completion date: December 7, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Addressing | Permit status: Not reqd | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Site development | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Life safety | Permit status: Approved | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Life safety | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Structural | Permit status: Approved | Completion date: December 17, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Structural | Permit status: Required | Completion date: December 17, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Fire bureau | Permit status: Approved | Completion date: December 24, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Environmental services | Permit status: Approved | Completion date: March 16, 2016 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Environmental services | Permit status: Approved | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Transportation | Permit status: Not reqd | Completion date: December 4, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Water bureau review | Permit status: Not reqd | Completion date: December 8, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32x32 concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Permit type: Parks bureau | Permit status: Approved | Completion date: December 10, 2015 | Permit id: 2015-273373-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump is used to regulate fuel between the two tanks. Cover slab under 15-273373-co. Permit type: Intake | Permit status: Approved | Completion date: December 7, 2015 | Permit id: 2015-273382-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump is used to regulate fuel between the two tanks. Cover slab under 15-273373-co. Permit type: Mechanical review | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2015-273382-000 | |||||
Repair and replace broken fender piling within willamette river with 16 inch steel or wood piles. Replace supporting piles and repair damaged ladder and stair access for boat house Date: July 2, 2009Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: August 19, 2009 | Current use: Factory/industrial | Permit id: 2007-166634-000 | |||||
Install 2 pads with canopies at truck loading (m - fuel dispensing), concrete spill containment pads with curbs under pipeline equipment, impervious liner in tank containment area, oil water separator and stormwater detention basins (u occupancy) Date: July 30, 2008Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: July 13, 2009 | Current use: Factory/industrial | Permit id: 2007-153474-000 | |||||
Installation of an in line above ground pump between two existing above ground storage tanks. Pump will be attached to a new 32"x32" concrete slab with a 8x by 9 tall metal cover structure. Pump is used to regulate fuel between the two tanks. Date: July 11, 2016Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Issued | Current use: Utility | Permit id: 2015-273373-000 | |||||
Install (1) new concrete footing for stormwater tank (existing lubes plant) Date: June 13, 2016Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: November 2, 2016 | Current use: Utility | Permit id: 2016-187137-000 | |||||
Interior alteration to add stormwater tank #2 foundation inside lubricant storage warehouse on existing slab on grade Date: September 2, 2016Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 2, 2016 | Current use: Factory/industrial | Permit id: 2016-203115-000 | |||||
Install new storm water disposal system to replace part of (e)-additional plumbing permits and plumbing inspections required Date: September 23, 2002Permit type: Alteration | Permit status: Final | Completion date: January 14, 2003 | Current use: Utility | Permit id: 2002-131204-000 | |||||
Stabilize existing retaining wall supporting a metal storage building. Paving between buidling and retaining wall. Date: November 29, 2000Permit type: Alteration | Permit status: Final | Completion date: March 1, 2001 | Current use: Utility | Permit id: 2000-172409-000 | |||||
Fill in two vents in abandoned building to create fire wall to comply with lur. Date: June 29, 2001Permit type: Alteration | Permit status: Final | Completion date: July 3, 2001 | Current use: Factory/industrial | Permit id: 2001-146368-000 |