ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Fire damage repair~restore back to original configuration: main house ~ remodel kitchen; remodel bathroom; framing repair; r r water heater; repair roof framing; remodel basement-level bathroom; sheetrock repair in garage; replace furnace & water heater; replace 28 windows; repair exterior stucco 2 19 09 ~ provided one-line drawings for new gas lines and new hot & cold water lines, approved otc by jesse bright (bldg plbg mech elec) Date: June 25, 2008Permit type: Building | Permit status: Finaled | Completion date: April 30, 2009 | Permit id: Cb08-0497 | |||||
Deferreed truss calcs for fire damage repair Date: August 5, 2008Permit type: Building | Permit status: Finaled | Completion date: April 30, 2009 | Permit id: Cb08-0497-Bds1 | |||||
Install earthquake shut off valve at gas meter - manufacture: pacific seismic products, inc. Model 3 series horizontal 3 4" horizontal valve Date: March 3, 2009Permit type: Plumbing | Permit status: Finaled | Completion date: April 29, 2009 | Permit id: P09-0146 | |||||
(to complete permit #e05-0142) upgrade electrical to 125 amps Date: March 11, 2009Permit type: Electrical | Permit status: Issued | Permit id: E09-0130 | |||||
Pre-1942 fire pre-inspection ~ applicant will schedule pre-inspection after abatement work is performed Date: March 27, 2008Permit type: Building | Permit status: Finaled | Completion date: April 16, 2008 | Permit id: B08-0334 | |||||
Pre-1942 demo interior fire damage sfd (demo interior non-bearing walls remove sheetrock demo water,gas,hvac,ductwork,lights,plugs) & temporary power @ main panel (bdlg plbg mech ele) Date: April 17, 2008Permit type: Building | Permit status: Finaled | Completion date: January 26, 2009 | Permit id: Cb08-0306 | |||||
Fire damage repair~restore back to original configuration: main house ~ remodel kitchen; remodel bathroom; framing repair; r/r water heater; repair roof framing; remodel basement-level bathroom; sheetrock repair in garage; replace furnace & water heater; replace 28 windows; repair exterior stucco 2/19/09 ~ provided one-line drawings for new gas lines and new hot & cold water lines, approved otc by jesse bright (bldg/plbg/mech/elec) Date: July 21, 2008Permit type: Building | Permit status: Permit finaled | Completion date: April 30, 2009 | Expiration date: July 21, 2011 | Current use: Residential | Permit id: Cb08-0497 | |||||
Install earthquake shut off valve at gas meter - manufacture: pacific seismic products, inc. Model 3 series horizontal 3/4" horizontal valve Date: March 3, 2009Permit type: Plumbing | Permit status: Permit finaled | Completion date: April 29, 2009 | Expiration date: March 2, 2012 | Permit id: P09-0146 | |||||
Pre-1942 demo interior fire damage sfd (demo interior non-bearing walls/remove sheetrock/demo water,gas,hvac,ductwork,lights,plugs) & temporary power @ main panel (bdlg/plbg/mech/ele) Date: April 17, 2008Permit type: Building | Permit status: Permit finaled | Completion date: January 26, 2009 | Expiration date: April 17, 2011 | Current use: Residential | Permit id: Cb08-0306 |