ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Remove overhead cable,dig and backfill trench; build conduit; install cable and associated equipment in accordance with pepco plan no. 3421997. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: July 10, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 296644 |