ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
3 ckts for hvac roof top unit, exhaust fan & service plug Date: December 23, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: January 13, 2015 | Permit id: 2014-253149-000 | |||||
Push/pull 7. 5-ton gas pack Date: January 8, 2015Permit type: Intake | Permit status: Closed | Completion date: January 8, 2015 | Permit id: 2015-102577-000 | |||||
Low volt controls wiring t-stats Date: January 8, 2015Permit type: Intake | Permit status: Closed | Completion date: January 8, 2015 | Permit id: 2015-102617-000 | |||||
Widmer- 4 branch ckts for kitchen remodel Date: January 20, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: January 30, 2015 | Permit id: 2015-107065-000 | |||||
2nd floor office remodel Date: May 14, 2014Permit type: Intake | Permit status: Closed | Completion date: May 14, 2014 | Permit id: 2014-156555-000 | |||||
Craft brew job#63876 low voltage cabling for projector Date: August 6, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 8, 2014 | Permit id: 2014-194479-000 | |||||
Repair floors and walls damaged by rot. Remove existing beams and restructure portion of existing 2nd floor with new lvl joists. Add new topping slab at existing brewhouse and fermentation room. Prepare shell space for future ti. Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: December 16, 2015 | Permit id: 2015-277735-000 | |||||
Revision to structural details due to existing conditions Date: February 25, 2016Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2015-277735-Rev | |||||
Replace floor drains; add floor drains; add hose bibs and sink Date: February 19, 2016Permit type: Intake | Permit status: Closed | Completion date: February 19, 2016 | Permit id: 2016-123561-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Application | Permit status: Approved | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Application | Permit status: Approved | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Site development | Permit status: Not reqd | Completion date: March 23, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Life safety | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Structural | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: March 28, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Fire bureau | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Environmental services | Permit status: Approved | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Environmental services | Permit status: Approved | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Transportation | Permit status: Not reqd | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot/cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air/exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Parks bureau | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-127647-000 | |||||
Install new make up/exhaust air system with 16-127647-co Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-127656-000 | |||||
Install new make up/exhaust air system with 16-127647-co Permit type: Fire bureau | Permit status: Not reqd | Completion date: March 23, 2016 | Permit id: 2016-127656-000 | |||||
Sprinkler - add (4) heads to accommodate remodel, replace (5) heads due to being painted Date: April 5, 2016Permit type: Intake | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-145287-000 | |||||
Low voltage wiringfaxed Date: January 17, 2012Permit type: Intake | Permit status: Closed | Completion date: January 17, 2012 | Permit id: 2012-104031-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Application | Permit status: Approved | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Application | Permit status: Approved | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Issuance/intake | Permit status: Intake | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Planning and zoning | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Site development | Permit status: Not reqd | Completion date: March 23, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Life safety | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Structural | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: March 28, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Fire bureau | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Environmental services | Permit status: Approved | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Environmental services | Permit status: Approved | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Transportation | Permit status: Not reqd | Completion date: February 29, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-127647-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Permit type: Parks bureau | Permit status: Approved | Completion date: March 22, 2016 | Permit id: 2016-127647-000 | |||||
Install new make up exhaust air system with 16-127647-co Permit type: Intake | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-127656-000 | |||||
Install new make up exhaust air system with 16-127647-co Permit type: Fire bureau | Permit status: Not reqd | Completion date: March 23, 2016 | Permit id: 2016-127656-000 | |||||
Structural modifications for new sign Date: May 9, 2005Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: October 18, 2005 | Current use: Business | Permit id: 2005-127617-000 | |||||
Tenant improvement 2nd floor -two conference rooms & one office Date: October 2, 2007Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2007-138618-000 | |||||
Replace slab in finishing cellar and install tanks on concrete foundations Date: October 17, 2008Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Under inspection | Current use: Storage | Permit id: 2008-171178-000 | |||||
Add acoustic ceiling tiles; drop ceiling Date: February 10, 2012Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: March 15, 2012 | Current use: Business | Permit id: 2012-111676-000 | |||||
Structural support for evaporative condenser Date: October 11, 2012Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: November 7, 2012 | Current use: Business | Permit id: 2012-184681-000 | |||||
Ti - reduce size of exisitng brewing system from 30bbl to 10bbl; reduce size of fermentation room. Reconfigure existing floor drains and existing hot cold water systems. Apply new finishes to brewhouse and ferm. Room. Replace interior ramp off of loading dock and add a new man door. Remove, reconfigure, and replace concrete slab off new ramp. New make up air exhaust system under 16-127656-mt. Structural repair work is being done under 15-277735-co. Date: June 20, 2016Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Issued | Current use: Factory/industrial | Permit id: 2016-127647-000 |