| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Bldg #287146 Date: September 9, 2003Permit type: Electrical permit | Permit status: Finaled | Completion date: May 5, 2004 | Current use: Single family dwelling | Permit id: 318076 | |||||
Building residential Date: November 21, 2002 Value: $250,000Permit status: Finaled | Completion date: May 5, 2004 | Current use: Single family dwelling | Permit id: 287146 | |||||
Generator Date: October 25, 2010Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 552626 | |||||
Place hand hole and conduit under le velle drivein accordance with verizon plan no. 8a08003,fios. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 18, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 355065 | |||||
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector chris cary @ 301-370-3686. Install cable tv service drop from pole, under le velle drive by bore and onto the property of 9214 le velle drive. Work will be in the pue except for the road crossing which will be in the county right of way. Comcast #111103. 1. Notify mc. Dps inspector when work is complete utility representative: mark warren @ 301-762-7863. Date: December 4, 2003Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 225359 | |||||
Construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 remove existing mc 301. 01 driveway apron and replace with curb and gutter. Date: November 18, 2002Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 218681 | |||||
Pre-construction meeting required contact mc. Dps inspector chris cary @ 301-370-3686 install/replace cable tv service drop. Work will be in the pue except for one, single road bore. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Note: construction crews & contractors shall not drive or park vehicles over curbs, sidewalks and/or green (grassed) areas. Violators & vehicle operators may be subject to civil citations & fines in the amount of 500. 00. Notify mc. Dps inspector when work is complete utility representative: mark warren @ 301-309-5078 comcast #052104. 1 Date: June 17, 2004Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 229541 |