ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install gas service associated equipment in accordance with washington gas plan no. 372154. Permittee musthave preconstruction meeting with dps row inspector prior to beginning of construction work for sidewalk and ada ramp restoration. Sidewalk and ada ramp shall be restored per the current ada guidelines. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: December 15, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 320964 | |||||
Dirt cut,install 2 anodes in existing test box, gas service in accordance with washington gas plan no. 154395. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: November 14, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 283118 |