ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: September 30, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: August 14, 2015 | Current use: Single family dwelling | Permit id: 689813 | |||||
Geothermal heat pump Date: September 17, 2014Permit type: Mechanical permit | Permit status: Finaled | Completion date: August 14, 2015 | Current use: Single family dwelling | Permit id: 688299 | |||||
Building residential permit Date: June 30, 2014 Value: $600,000Permit status: Finaled | Current use: Single family dwelling | Permit id: 650865 | |||||
Install pole, overhead wire, make pole a urd cable pole. Bore roadway, build conduit; install cable and associated equipment in accordance with pepco plan no3463753. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 6, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 324569 | |||||
Construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission are required prior to
|