ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temporary construction entrance construct temporary stabilized construction entrance. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit remove construction entrance. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Md dnr permit and mc dot highway serivces tree division permission are required prior to remove stree Date: February 20, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 308886 | |||||
Place, splice and test aerial/buried fiber optic cable facilities in accordance with verizon plan no. 8a17596 fiber cable for fios. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: May 8, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 274065 |