ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construct temporary stabilized construction entrance (s) and subject to the conditions as noted below. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release of this permit, the temporary entrance will be removed and complete repair shall be made of any and all damages done to the existing improvements in the public right of way. Construct storm drains in accordance with mc stds and specifications and approved plans. Prior to placement of any curb & gutter or pavement "all" utility crossings must be certified as being in place. Construct concrete sidewalk, concrete curb and gutter, driveway aprons, sidewalk and street paving as per approved mc stds & spec. And approved plans. Install street lights in accordance with plans to be approved by the division of traffic and parking services, mc-dot. Plant street trees in accordance with mc code, sec. 49-35(j)(i). Date: July 29, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Paving and storm drain | Permit id: 268503 | |||||
Install gas service in accordance with washington gas plan no. 125698. Work shall comply with the current montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: August 2, 2011Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 269071 |