ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition of real estates offices Date: October 15, 2007Permit type: Demolition or move permit | Permit status: Finaled | Current use: Business building | Permit id: 458703 | |||||
Permittee must contactjames kisnerof mcdot at 240-372-1733 immediately to coordinate work schedule. Paving is scheduled to beginon 3/1/17as of 11/28/16. Must have preconstruction meeting with dps row inspector prior to beginning of construction work. Abandongas service in accordance with washington gas plan no. 714265. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps Permit type: Public right of way | Permit status: Open | Current use: Public utility | Permit id: 355272 | |||||
Install gas service... 4x4 cut over main gas service in accordance with washington gas plan no. 521596. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 20, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 334289 |