Building Permits at 916 Thayer Ave Silver Spring, MD 209


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 916 Thayer Ave Silver Spring, MD 209 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Demolition of real estates offices
Date:  October 15, 2007

Permit type: Demolition or move permit | Permit status: Finaled | Current use: Business building | Permit id: 458703
2007/10/15095916 Thayer Ave Silver Spring, Md 209
Permittee must contactjames kisnerof mcdot at 240-372-1733 immediately to coordinate work schedule. Paving is scheduled to beginon 3/1/17as of 11/28/16. Must have preconstruction meeting with dps row inspector prior to beginning of construction work. Abandongas service in accordance with washington gas plan no. 714265. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps

Permit type: Public right of way | Permit status: Open | Current use: Public utility | Permit id: 355272
095916 Thayer Ave Silver Spring, Md 209
Install gas service... 4x4 cut over main gas service in accordance with washington gas plan no. 521596. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work.
Date:  April 20, 2015

Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 334289
2015/04/20095916 Thayer Ave Silver Spring, Md 209
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.