ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Set sl hh at mmp at row of n peters st. Bore 125 using 2x1. 25" hdpe then bore another 195 to the side of the building. Then core bore into the 1st - 3rd riser room and run 25 along room and rise up to the 3rd floor. Finally sl will run fiber another 75 in dc to demarc. Sl will leave 1 slack in hh and at demarc. 96ct fiber. Sl will notify property at least 24 hours prior to construction. Ground conditions will be restored to existing or better conditions. No exterior work. No vcc permit necessary. Date: December 13, 2016Permit type: Vcc general work | Permit status: Permit not required | Completion date: December 20, 2016 | Current use: Business use | Permit id: 16-40343-Vcgen | |||||
SCORE 82 Set sl hh at mmp at row of n peters st. Bore 125 using 2x1. 25" hdpe then bore another 195 to the side of the building. Then core bore into the 1st - 3rd riser room and run 25 along room and rise up to the 3rd floor. Finally sl will run fiber another 75 in dc to demarc. Sl will leave 1 slack in hh and at demarc. 96ct fiber. Sl will notify property at least 24 hours prior to construction. Ground conditions will be restored to existing or better conditions. Permit type: Renovation (non-structural) | Permit status: Application submitted | Current use: Business use | Permit id: 16-40343-Rnvn | |||||
Place sl hh at mmp at row of n peters st. And leave 1 slack. Then bore using 2x1. 25" building. Hdpe then turn and bore another 1 to the side of the building and core bore into the 1stfloor electrical riser room and leave slack. Then rise up from the 1st floor to 3rd floor riserroom. Then pull another 75 from riser room to 3rd floor telco closet rack in drop ceiling andleave slack. Construction 3-4 days 96 ct. Sl will leave 1 slack in hh and at demarc. 96ct fiber. Sl will notify property at least 24 hours prior to construction. Ground conditions willbe restored to existing or better conditions. Sl estimates 2-3 days to complete construction. All work is interior. No vcc permit required. Date: March 27, 2017Permit type: Vcc general work | Permit status: Permit not required | Completion date: March 28, 2017 | Current use: Business use | Permit id: 17-09941-Vcgen | |||||
SCORE 82 Place sl hh at mmp at row of n peters st. And leave 1 slack. Then bore using 2x1. 25" building. Hdpe then turn and bore another 1 to the side of the building and core bore into the 1stfloor electrical riser room and leave slack. Then rise up from the 1st floor to 3rd floor riserroom. Then pull another 75 from riser room to 3rd floor telco closet rack in drop ceiling andleave slack. Construction 3-4 days 96 ct. Sl will leave 1 slack in hh and at demarc. 96ct fiber. Sl will notify property at least 24 hours prior to construction. Ground conditions willbe restored to existing or better conditions. Sl estimates 2-3 days to complete construction. Permit type: Renovation (non-structural) | Permit status: Permit issued | Expiration date: October 26, 2017 | Current use: Business use | Permit id: 17-09941-Rnvn |