| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 82 Place sl hh at mmp at row of n peters st. And leave 1 slack. Then bore using 2x1. 25" building. Hdpe then turn and bore another 1 to the side of the building and core bore into the 1st floor electrical riser room and leave slack. Then rise up from the 1st floor to 3rd floor riser room. Then pull another 75 from riser room to 3rd floor telco closet rack in drop ceiling and leave slack. Construction 3-4 days 96 ct. Sl will leave 1 slack in hh and at demarc. 96ct fiber. Sl will notify property at least 24 hours prior to construction. Ground conditions will be restored to existing or better conditions. Sl estimates 2-3 days to complete construction. Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Business use |