ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 88 Installing a new 2 ply modified bitumen over the new roof insulation. The old roof will remain in place. The base layer will be flintastic ultra glass sa. Self adhered membrane with a total thickness of 118mils. Following this application a backer ply will be installed at the roof to wall transitions. After the backer sheet is installed a flintastic gta cap sheet will be installed with a total thickness of 166mils. The total system overlay is 2 plys of roofing with a total thickness of 284mils. Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Business use | |||||
SCORE 83 Installing a new 2 ply modified bitumen over the new roof insulation. The old roof will remain in place. The base layer will be flintastic ultra glass sa. Self adhered membrane with a total thickness of 118mils. Following this application a backer ply will be installed at the roof to wall transitions. After the backer sheet is installed a flintastic gta cap sheet will be installed with a total thickness of 166mils. The total system overlay is 2 plys of roofing with a total thickness of 284mils. Permit type: Renovation (non-structural) | Permit status: Permit issued | Current use: Business use |