ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install stages in 2 tents (1 x 180). Dinner auction on 10/15/2005 one night only. Date: October 14, 2005 Value: $2,000Permit type: Commercial building | Permit status: Finaled | Completion date: October 15, 2005 | Current use: Commercial miscellaneous struc | Permit id: 397093 | |||||
Install 9 portable stages in 2 tents (1 x 180). Dinner auction on 10/28/2006 only. Date: October 20, 2006 Value: $3,000Permit type: Commercial building | Permit status: Finaled | Completion date: October 28, 2006 | Current use: Commercial miscellaneous struc | Permit id: 430338 | |||||
Stage, band, speeches Date: October 17, 2008 Value: $4,000Permit type: Commercial building | Permit status: Finaled | Completion date: October 17, 2008 | Current use: Miscellaneous structure | Permit id: 496813 | |||||
Commercial change of use-residential to place of worshipexisting single family house being converted to religious use revision submitted on 12/3/2013 for electrical and mechanical only revision submitted on 6/9/2015-architectural only revision issued on 8/17/15 (emc) Date: August 26, 2013 Value: $200,000Permit type: Commercial building | Permit status: Finaled | Completion date: October 20, 2015 | Current use: Place of worship | Permit id: 623618 | |||||
Electrical permit Date: January 24, 2000Permit status: Finaled | Completion date: August 1, 2000 | Current use: Single family dwelling | Permit id: 209714 | |||||
Bldg. Permit # 205291 Date: May 3, 2000Permit type: Electrical permit | Permit status: Finaled | Completion date: August 1, 2000 | Current use: Single family dwelling | Permit id: 218100 | |||||
3 generators 1 kw each Date: October 14, 2005Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 400957 | |||||
2 generators/ 1 1 kw/ 1 1 kw Date: October 26, 2006Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 437151 | |||||
3- temporary generators for a best bubbly ball 10/17-10/22 2 1 kw en. & 1 175 kw gen. Date: October 15, 2007Permit type: Electrical permit | Permit status: Issued | Current use: Commercial miscellaneous struc | Permit id: 468423 | |||||
Temporary wiring and generators for a private party one (1) day only 10/18/08 -- generator unit qty. (4) size 120kw/3 amps Date: October 15, 2008Permit type: Electrical permit | Permit status: Finaled | Completion date: October 17, 2008 | Current use: Commercial miscellaneous struc | Permit id: 498005 | |||||
Electrical permit Date: October 14, 2014Permit status: Finaled | Completion date: September 8, 2015 | Current use: Single family dwelling | Permit id: 691275 | |||||
Place of worship - additional equip.: 1- kw generator, 4-5. 5 kw each generator Date: October 14, 2014Permit type: Electrical permit | Permit status: Finaled | Current use: Place of worship | Permit id: 643142 | |||||
Pool house-permit extended until 2/2/2016- see log Date: February 20, 2013 Value: $50,000Permit type: Building residential permit | Permit status: Finaled | Current use: Residential accessorystructure | Permit id: 626534 | |||||
Replace oh equipment,install transformer & cables in connection with providing new service to new ma center in accordance with pepco plan no. 3459430. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: January 29, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 329793 | |||||
Remove existing shc and installnew sewer house connections and water house connection in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: July 29, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 319146 |