ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construct storm drains in accordance with montgomery county standards and specifications and approved plans. Prior to placement of any curb & gutter or pavement all utility crossings must be certified as being in place. Construct concrete sidewalk, concrete curb and gutter, driveway aprons, sidewalk and street paving as per approved montgomery county standards and specifications and approved plans. Install street lights in accordance with plans to be approved by the division of traffic and parking services, montgomery county department of public works and transportation. Plant street trees in accordance with montgomery county code, sec. 49-35(j)(i). Date: January 6, 2011Permit type: Public right of way | Permit status: Completed | Current use: Storm drain | Permit id: 267991 | |||||
Public row (restoration): complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pipe size 17" x 13" c. M. P. Mcdot standard:301. 03 Date: October 12, 2007Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 255010 | |||||
Make pole a urd cable pole,install animal and associated equipment in accordance with pepco plan no. 3360408. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: August 23, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 270794 | |||||
Public row (restoration): complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pipe size 17" x 13" c. M. P. Mcdot standard: mc 301. 03 Date: October 12, 2007Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 255013 |