ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pa: provide and install 90il capsheet over existing, approx 200s/f to cover section of the roof directly over the public hall. Apply flashing to the pe Date: August 12, 2010Permit type: Gc | Permit id: Eb06601 | |||||
At basement apt: at rear window replace 2 broken windows completely with new aluminum replacement windows including outside capping and caulking als Date: October 26, 2010Permit type: Gc | Permit id: Eb13149 | |||||
At bldg 1st story public hall stairs replace missing balusters total of ( 8 ) and secure entire balustrate & moldings at the time of this invitati Date: June 21, 2011 Value: $292Permit type: Gc | Permit id: Eb34701 | |||||
At public hall replace 2 wood treads # and 12 from bottom at fisrt floor to second floor intall l brackets 4 on each treads. Remove all work relate Date: October 21, 2010 Value: $264Permit type: Gc | Permit id: Eb13153 | |||||
Pa: provide and install 90il capsheet over existing, approx 200s f to cover section of the roof directly over the public hall. Apply flashing to the pe Date: August 12, 2010Permit type: Gc | Permit id: Eb06601 | |||||
Apt # 2: remove all obstruction and properly repair the water closet in order to proper working order in the bathroom. Remove all work related d Date: August 2, 2011Permit type: Plumb | Permit id: Ec03563 | |||||
Remove existing heating plant and install new boiler. Install new cast iron/ steel gas fired boiler to supply adequate heat and hot water to building Date: December 12, 2007Permit type: Heat | Permit id: E814219 | |||||
National grid provide gas to boiler / hot water heater. Date: March 6, 2012Permit type: Util | Permit id: Ec23330 | |||||
At apt 1 replace entrance door to the apt with kalamein door with frame standard hardware ,self closing hinges and lockset , also do all restorati Date: October 26, 2010Permit type: Gc | Permit id: Eb13163 | |||||
Entire building: troubleshoot, repair and restore electricity to the cellar, all stories of the public hall. Remove all work related debris. No Date: January 5, 2011Permit type: Elec | Permit id: Eb18288 | |||||
National grid provide gas to boiler / hot water heater. Date: May 26, 2010Permit type: Util | Permit id: Ea36987 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01340 | |||||
Keyspan provide gas to boiler/hot water heater Date: November 20, 2007Permit type: Util | Permit id: E812782 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2012Permit type: Util | Permit id: Ed04034 | |||||
Keyspan provide gas to boiler hot water heater Date: November 20, 2007Permit type: Util | Permit id: E812782 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec01340 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2010Permit type: Util | Permit id: Eb02376 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel gas fired boiler to supply adequate heat and hot water to building Date: December 12, 2007Permit type: Heat | Permit id: E814219 | |||||
2nd fl: trace, locate and repair concealed roof leak(s) above the kitchen area. Provide approximately 24 sq. Ft. Of roofing capsheet . Provide appr Date: February 22, 2011Permit type: Gc | Permit id: Eb22730 |