ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 23 ft. Of pipe insulation. Date: March 25, 2003Permit type: Asbest | Permit id: E318345 | |||||
Dismantle and remove old boiler. Install 2x4 concrete pad. Install oil fired (4) sections boiler with domestic coil for hot water. Modify heade Date: March 27, 2003Permit type: Heat | Permit id: E318151 | |||||
As per mini rc #k301520a (emsl) and hpd specification, perform phase contrast microscopy (pcm) analysis of 04 air samples for fiber content utilizing Date: March 27, 2003Permit type: Asbest | Permit id: E318954 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: April 7, 2003Permit type: Util | Permit id: E319905 | |||||
As per mini rc #k301520a (emsl) and hpd specification perform polarized light microscopy (plm) analysis of 01 samples for asbestos content utilizing p Date: March 24, 2003Permit type: Asbest | Permit id: E318344 | |||||
Provide single fuel drop. 275 gallons, #2 fuel. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb fu Date: March 6, 2003Permit type: Util | Permit id: E317352 |