ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: April 17, 2002Permit status: Finaled | Completion date: June 14, 2002 | Current use: Single family dwelling | Permit id: 275037 | |||||
Building residential Date: April 17, 2002 Value: $20,000Permit status: Finaled | Completion date: June 14, 2002 | Current use: Single family dwelling | Permit id: 274955 | |||||
1 1/2 floor electric heat Date: January 11, 2012Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 588638 | |||||
75kw/2 amp generator. Date: March 4, 2013Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 627659 | |||||
Generator Date: April 2, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 630298 | |||||
Mechanical permit Date: January 13, 2012Permit status: Finaled | Current use: Single family dwelling | Permit id: 588789 | |||||
New sunroom & expansion dining revision-adding (4) windows-12/30/2012 Date: September 29, 2011 Value: $75,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 580161 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install gas service in accordance with washington gas plan no. 167586. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Date: March 21, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 289910 | |||||
House drain connection to row: install a yard drain within the county right of way. Drain pipe will be connected into the county storm drain structure or pipe as directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Date: November 14, 2011Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 271816 |