ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Cash bond ps4a17289 Date: June 23, 2004Permit type: Demolition or move p | Permit status: Completed | Completion date: July 19, 2004 | Current use: Single family dwelling | Permit id: 345039 | |||||
Electrical permit Date: October 29, 2004Permit status: Finaled | Completion date: June 2, 2005 | Current use: Single family dwelling | Permit id: 363553 | |||||
Building residential Date: August 24, 2004 Value: $350,000Permit status: Finaled | Completion date: June 2, 2005 | Current use: Single family dwelling | Permit id: 345038 | |||||
Deck Date: June 29, 2005 Value: $6,727Permit type: Building residential | Permit status: Finaled | Completion date: September 7, 2005 | Current use: Deck | Permit id: 389035 | |||||
Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 Date: July 12, 2004Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 229570 | |||||
On ewing drive (house #9006) install 3/4 inch plastic service in accordance with washington gas plan no. 70644. Construct utility pavement patch as directed. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pe-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Date: November 8, 2004Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 232549 | |||||
On ewing drive (house #9006) install 4 amp underground service, dig and backfill trench, build conduit, install cable and associated equipment in accordance with pepco plan no. 53058680. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Date: March 11, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 234903 |