ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 21, 2015Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 5, 2016 | Permit id: Pds2015-Resalt- | |||||
3300sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer owens corning brand and model tru definition color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) n/a specific exemption from cool roof requirements (if applicable) n/a required building inspector field verification (if applicable) self certification note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: December 9, 2015 Value: $19,569Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 16, 2015 | Permit id: Pds2015-Resalt- | |||||
SCORE 99 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: December 21, 2015 Contractor: Home Energy Systems IncPermit type: Residential alteration-addn | Permit status: Completed | Completion date: January 5, 2016 | Permit id: Pds2015-Resalt- | |||||
3300sf re-roof for existing sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer owens corning brand and model tru definition color (if cool roof required) amber built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) n a required building inspector field verification (if applicable) self certification note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: December 9, 2015 Value: $19,569Permit type: Residential alteration-addn | Permit status: Completed | Completion date: December 16, 2015 | Permit id: Pds2015-Resalt- | |||||
Final Date: January 4, 2016Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: December 14, 2015Permit status: Pass | Permit id: Pds2015-Resalt- | |||||
Final Date: April 22, 2007Permit status: Pass | Permit id: Pds2007-1030-20 |